PROCEEDINGS
THIRTEENTH ANNUAL CONVENTION
American Railway Engineering Association
HELD AT THE
CONGRESS HOTEL, CHICAGO, ILLINOIS March 19, 20 and 21, 1912
VOLUME 13
PUBLISHED UNDER DIRECTION OF THE COMMITTEE
ON PUBLICATIONS
1912
TABLE OF CONTENTS.
PAGE.
TABLE OF CONTENTS 7-20
CONSTITUTION.
CONSTITUTION 23-31
Name, Object and Location 23
Membership '. . . 23, 24
Admissions and Expulsions 24, 25
Dues 26
Officers 26. 27
Nomination and Election of Officers 27-29
Management 29, 30
Meetings 30, 3 1
Amendments 31
GENERAL INFORMATION.
GENERAL INFORMATION 32-36
Appointment of Committees and Outline of Work 32
Preparation of Committee Reports 32-34
Publication of Committee Reports 34
Consideration of Committee Reports 34. 35
General Rules for the Publication of the Manual 36
BUSINESS SESSION.
BUSINESS SESSION 39-62
Introductory Remarks by the President 39
President's Address 40-48
Association Affairs 40-44
Progress in Engineering Works 44-47
The Complete Engineer of 300 Years Ago 47, 48
7
8 TABLE OF CONTENTS.
BUSINESS SESSION— Continued.
PAGE.
Report of Secretary 49-52
r> Membership 4Q. 50
Geographical Distribution of Membership . ; 50
Classification of Members 50
Publications 51
Financial Statement 5 1., 52
Expenditures in Detail 52
Report of Treasurer . .. , 53
Condensed Report of Convention 54-62
Resolutions Adopted 59-62
Report of Tellers 59, 60
Election and Installation of Officers 61
COMMITTEE REPORTS.
RULES AND ORGANIZATION 65-68
Introductory ;. ...... • 65
Instructions as to Conduct of Work 66-68
Cross-Sections ' 66
Drainage 66
Ballasting 66
TlCS '• ■■■-. 66'67
Rail 67
Surfacing 68
SIGNALS AND INTERLOCKING .:...: 69-74
Introductory 69
Conclusions 69, 70
Table of Insulation Resistances 70
Uniform Signaling 7°'74
Essentials of Signaling 70, 71
Minority Report '. .v 75,76
WOODEN BRIDGES AND TRESTLES 77-8o
Introductory 77, 78
Sheet Piling — Progress Report 78, 79
1 Pile Formulas — Progress Report '. 79
Guard Rails — Progress Report 79
Fii s Protection — Progress Report 79, 80
TABLE OF CONTENTS. 9
PAGE.
IRON AND STEEL STRUCTURES 81-88
Introductory 81, 82
Conclusions 82
Specifications for the Erection of Railroad Bridges . . . . 83-87
Work to Be Done 83
Falsework ' 83
Conduct of Work 83, 84
Engine Service 84
Transportation 84
Masonry 84
Handling and Storing Materials 84
Maintenance of Traffic .' 85
Removal of Old Structure 85
Metal Work 85
Misfits 85, 86
Anchor Bolts ' 86
Bed Plates 86
Decks 86
Painting 86
Clearing the Site 86
Superintendence and Workmen 86, 87
Inspection 87
Responsibility 87
Insurance and Bond 87
Engineer Defined 87
Secondary Stresses 88
YARDS AND TERMINALS 89-93
Introductory 89
Typical Situation Plans of Passenger Stations 90
Handling of Freight by Al'echanical Means 90, 91
Typical Situation Plans for Division Engine Terminal 91,92
Conclusions 93
BALLAST 95-300
Introductory 95
Proper Depth of Ballast to Insure Uniform Distribution of the
Loads on the Roadbed 95-97
10 TABLE OF CONTENTS.
BALLAST — Continued.
pagf.
Physical Tests of Stone for Ballast 97-99
Review of Gravel Ballast and Methods for Grading the Differ- ent Qualities 99-102
Gravel Washing Plant of the Richmond, Fredericksburg &
Potomac Railroad 10.3- 1 10
Experiment to Determine the Necessary Depth of Stone
Ballast 113-265
Description of Test Track 1 14-121
Methods of Tests 122-127
Conclusions 126, 127
Detail of Tests 128-265
Gravel as Ballast 266-289
Ballast (Monograph by G. W. Vaughan) 290-300
TIES 301-370
Introductory 3°[
Size of Cross-Ties Required for the Stresses to Which They
Are Subjected 301-331
Bearing Strength of Ties Under the Rail Tests 303
Bibliography on Size of Cross-Ties 307-311
Summary of Answers to Circular Regarding Size of Cross-Ties Required for the Stresses to Which They Are
Subjected 312-329
Arrangement of Ties Under Joints 330
Conclusions Mi
Tie Renewals in Continuous Stretches Versus Single-Tie Re- newals 332-34-'
Co .elusion 342
Metal, Composite and Concrete Ties 343"370
Conclusions 37c'
TRACK 371-386
Introductory 371
Frogs, Crossings and Switches 37I_374
Tie-Plates and Track Fastenings 374
Designs of Main Line Turnouts 374
Vertical Curves 374
Conclusions 37 4
TABLE OF CONTENTS. 11
TRACK — Continued.
page. General Specifications for Frogs, Crossings and Switches. .. .375-386
General Instructions 375
Inspection 375) 3?6
Material ^76, 377
Workmanship 377
Fr°gs 377,37*
Switches 381-386
ROADWAY 387-400
Introductory 387
Waterway Formulas 387, 388
Unit Pressures Allowable on Roadbeds of Different Materials. .388-396
Tunnel Construction and Ventilation 306
Agricultural Drainage as It Affects Railways 396, 397
Record of Tunnel Ventilation 398-400
WATER SERVICE 401-428
Introductory 401
Use of Reinforced Concrete for Water Tanks and Supports. .402-417 General Specifications for a Reinforced Concrete Standpipe
Water Tank for Railways 413-417
General Specifications for Ordinary Steel Water and Oil
Tanks 417-419
Conclusion 419
Locomotive Boiler Corrosion and Treated Water 420-428
CONSERVATION OF NATURAL RESOURCES 429-457
Introductory 429
Tree Planting and General Reforestation (United States) ... .430-437
Bibliography of Timber Resources 435-437
Coal and Fuel Oil Resources 437-454
Advantages of Oil as Fuel Compared to Coal 437, 438
Petroleum as a Locomotive Fuel 438, 439
Evaporative Tests — Oil as Fuel 439-441
Inspection and Tests of Fuel Oil 441-443
Government Fuel Oil Specifications 443, 444
Methods of Preventing or Lessening Waste 444-449
12 TABLE OF CONTENTS.
CONSERVATION OF NATURAL RESOURCES— Continued.
PAGE.
Coal Fields of the United States 449-452
Duration of Supply : 453. 454
Tree Planting and Reforestation in Canada ....455,456
Annual Fire Loss 456
Coal and Fuel Oil Resources 456, 457
Peat Deposits in Canada 457
Crude Petroleum ■ • 457
Natural Gas in Canada 457
MASONRY 459-504
Introductory 459
Waterproofing of Masonry 459-474
Methods of Patching and Repairing Plain and Reinforced
Concrete 474"4§7
Methods of Depositing Concrete Under Water 487-502
Conclusions 4S8
Report on Work of Joint Committee on Concrete and Rein- forced Concrete 502
Unification of Portland Cement Specifications 502-504
Conclusions 504
RECORDS AND ACCOUNTS i 505-507
Introductory ■ 505. 506
Reasons for Maintaining a Storehouse 506, 507
Conclusions 5°°. 5°7
ELECTRICITY 509-558
Introductory 5°9
Clearances • 510
. Transmission Lines and Crossings 510, 511
Recommendations ,, 511
Specifications for Overhead Crossings of Electric Light and
Power Lines 512-521
General Requirements 5r2-5i4
Loads 514. 515
Factors of Safety . . . .• ■ 515, 516
TABLE OF CONTENTS. 13
ELECTRICITY— Continued.
PAGE.
Material 516-518
Protective Coatings 518
Foundations ! ' 518
Working Unit Stresses '. 518, 519
Specification for Galvanizing for Iron or Steel 519-521
Data Regarding Third Rail Clearances 524
Diagrams Showing Equipment Lines of Various Railways 526-534
Diagrams Showing Third Rail Structure of Various Railways'. 535-558
RAIL 559-872
Introductory 559-564
Specifications for Carbon Steel Rails . . . . .565-571
Inspection 565
Material 565
Chemical Requirements ■ 565, 566
- Physical Requirements 566-569
Details of Mann f acture ( 569-571
A Study of Seventeen Good Service Rails 1 ^. .573-612
Rail Failure Statistics for Year Ending October 31, 1910 613-633
Thoughts Resulting from the Study . 633
Comparative Wear of Bessemer, Open-hearth and Nickel Steei
Rail on Pennsylvania Railroad .635-654
Segregation and Other Rail Properties as Influenced by Si?e
of Ingot . . . .655-751
Tests of Rail Steel Ingots and Derivative Shapes Made at
Watertown Arsenal , 753
Influence of Rolling Temperature on the Properties of Bes- semer Rails ,.,-..! 797-839
•Hearing Before Indiana Railroad Commission 841-862
The History and Development and Use of Rails by Rail- road Companies of the United States from 1830 . to
Date .843-850
Investigations Made by the American Society of Civil En- gineers on Steel Rails 851,852
The Question of the Improvement of Rail Design and
- Specifications from 1830 to the Present Time ^853-862
14 TABLE OF CONTENTS.
PAGF.
WOOD PRESERVATION 863-872
Grouping of Timbers for Antiseptic Treatment 863, 864, 868-872
Reco. ds from Service Tests 864
Merits of Various Preservatives 864
Revision of the Adopted Specifications for Creosote Oil 865, 866
Forms for Reporting Inspection 866
Specification for Impregnation with Creosote Oil 866
Value of Brush Coating and Dipping 867
Value of Impregnation with Crude Oil 867
Conclusions 867
GRADING OF LUMBER 873-884
Introductory 873
Recommendations 873, 874
Classification and Grading Rules for Cypress Lumber and
Shingles 875-884
General Instructions 875
Standard Defects 875-877
Standard Lengths 878
Standard Finished Sizes of Cypress 878, 879
Tank Stock 879
First and Second Clear 879, 880
Selects 880
Selected Common Tank Stock 880
No. 1 Barn or Dimension S80
No. 2 Barn or Dimension 880, 881
Cull or Peck 881
Finishing 88i, 882
Siding 882
Flooring and Ceiling 882
Partition 882
Pickets 883
Battens 883
Car Roofing and Siding 883
Car Lining 883
Shingles 883, 884
TABLE OF CONTENTS. 15
PAGE.
BUILDINGS 885-890
Introductory 885
Roof Coverings 885-800
Gutters 88&-88o
Flashings 889, 890
Details of Flashing and Counter Flashing for Roofs and
Walls 891-806
American Method of Laying Asbestos Shingles 897, 898
Diagonal Method of Laying Asbestos Shingles 899
SIGNS, FENCES AND CROSSINGS 900-904
Intro luctory 900
Quality of Fence Wire to Resist Corrosion and Secure Dura- bility 900-002
Concrete Fence Posts 902
Track Construction and Flangeways at Street Crossings in
Paved Streets 902, 903
Signs for Railroad Purposes 903, 904
Recommendations 904
ECONOMICS OF RAILWAY LOCATION 905,906
UNIFORM GENERAL CONTRACT FORMS 907-916
Introductory 907, 90S
Construction Contract — Agreement 909, 910
Construction Contract — General Conditions 911-916
Bond Oil
Contractor's Understanding 91 1
Intent of Plans and Specifications 911
Permits 91 1
Protection 911
Rights of Various Interests 911
Consent to Transfer 912
Superintendence 912
Timely Demand for Points and Instructions 912
Report Errors and Discrepancies 912
Preservation of Stakes 912
Inspection 912
16 TABLE OF CONTENTS.
UNIFORM GENERAL CONTRACT FORMS— Continued.
PAGE.
Defective Work or Material 912
Insurance 912
Indemnity '912
•- Settlement for Wages ■ 913
Liens 913
Work Adjacent to Railroad 913
Risk 913
Order and Discipline 913
Contractor Not to Hire Company's Employes 913
Intoxicating Liquors Prohibited 913
Cleaning Up , 913
Engineer and Chief Engineer Defined 913,914
Power of Engineer 914
Adjustment of Dispute 914
Order of Completion ; Use of Completed Portion . . . 914
Changes '■ ■ '■ 9J4
Extra Work .. ' . .914.915
Property and Right of Entry 915
Unavoidable Delays; Extension of Time on Parts of Work 915
Suspension of Work 915
Monthly Estimate 916
DISCUSSIONS.
RULES AND ORGANIZATION I . . . '9*0-931
SIGNALS AND INTERLOCKING 932, 933
IRON AND STEEL STRUCTURES 934-945
WOODEN BRIDGES AND TRESTLES ...... . 946
YARDS AND TERMINALS 947, 948
BALLAST ....i .049,950
ties .....:..:.. .:. 951-964
TRACK ;■■••••: r 965-980
ROADWAY 981,982
WATER SERVICE !;".'......... '." 983-988
CONSERVATION OF NATURAL RESOURCES. 989
TABLE OF CONTENTS. 17
DISCUSSIONS— Continued.
PAGE.
MASONRY 990-995
RECORDS AND ACCOUNTS 996, 997
ELECTRICITY 998-1016
RAIL 1017-1038
WOOD PRESERVATION 1039-1051
GRADING OF LUMBER 1052, 1053
BUILDINGS 1054
SIGNS, FENCES AND CROSSINGS 1055-105/
ECONOMICS OF RAILWAY LOCATION 105S
UNIFORM GENERAL CONTRACT FORMS 1059-1076
AMENDMENTS.
Amendments to Report on Uniform Rules and Organization... 1079
Amendments to Report on Iron and Steel Structures 1080
Amendments to Report on Ballast 1080
Amendments to Report on Track 1080
Amendments to Report on Water Service 1080
Amendments to Report on Electricity 1080, 108 1
Amendments to Report on Rail io8t
Amendments to Report on Wood Preservation 1081, 1082
Amendments to Report on Buildings 1082
Amendments to Report on Uniform General Contract Forms... 1082
MONOGRAPHS.
THE DESIGN OF RAILWAY BRIDGE ABUTMENTS,
by J. H. Prior 1085-1 150
Introductory 1085, 1086
Abutments Built of Stone Masonry 1087-1090
Abutments of Concrete, Plain and Reinforced 1091-H25
Memorandum of Total Cost of Various Types 1125-1141
Conclusion 1 142, 1 143
Discussion and Closure 1 149, 1 150
18 TABLE OF CONTENTS.
p EQUATED TONNAGE RATING FOR LOCOMOTIVES,
by M. H. Wickhorst 1 151-
Introductory „
Tonnage Rating of Locomotives, C. B. & Q. R. R 1152-
Tractive Force 1 153,
Train Resistance 1 155-
Equated Tonnage Tables 1 158,
Explanation of Method
Table of Tractive Force, Weights and Heating Surface....
Curves of Train Resistance, Frictional and Grade
Curves of Negative Train Resistance
Curves of Tractive Force of Engines
Curve of Engine Resistance
Method of Calculating Equated Train Resistances in Tons of
Train
Sample Tonnage Rates, Aurora Division, C. B. & Q. R. R.. . Equated Tonnage for 0.3 to 1.5 Per cent Grades 1167-
THE STORAGE BATTERY IN RAILWAY SERVICE,
by L. C. Fritch 1181-
Introductory
History 1 181-
The Lead-Sulphuric Acid Storage Battery 1183-
Principles of the Storage Battery 1 183,
The Lead Cell
Characteristics of the Lead Cell 1184-
Lead Battery Characteristics 1188,
Types of Plates 1 189-
Contaiuing Vessels 1 I93_
Method of Control and Controlling Apparatus
Definitions of Component Parts. . . . . 1198-
Special Instructions Regarding Lead Storage Batteries. .
The Edison Storage Battery 1206-
Theory of Chemical Reaction
Positive Plate
Negative Plate
Electrolyte
Insulation
180
180
154 158 159 159 160 161 162 163 164
165 166 180
221
181
183 205 184 iS-i 188 i8q 192
197 198 205
205
2IT 206 207
207
207 208
TABLE OF CONTENTS. 19
THE STORAGE BATTERY— Continued.
PAGE.
Container or Jar 1208
Trays or Boxes 1209
Connectors 1209
Voltage 1209
Efficiency 1209, 1210
Applications in Railway Service 1211-1220
Train Lighting 1211-1214
Signaling 1214, 1215
Drawbridge Operation 1215
Station Lighting 1215
Storage Battery Traction 1218
Storage Battery Charging Apparatus 1218-1220
List of Illustrations 1221
INDEX 1223-1236
CONSTITUTION
CONSTITUTION.
REVISED Al THE FIFTH, EIGHTH AND TWELFTH ANNUAL CONVENTIONS.
ARTICLE I.
NAME, OBJECT AND LOCATION.
i. The name of this Association is the American Railway Engi- neering Association.
2. Its object is the advancement of knowledge pertaining to the scientific and economic location, construction, operation and maintenance of railways.
3. The means to be used for this purpose shall be as follows :
(a) Meetings for the reading and discussion of reports and papers and for social intercourse.
(b) The investigation of matters pertaining to the objects of this Association through Standing and Special Committees.
(c) The publication of papers, reports and discussions.
(d) The maintenance of a library.
4. Its action shall be recommendatory, and not binding upon its members.
5. Its permanent office shall be located in Chicago, 111., and the annual convention shall be held in that city.
Name. Object.
Means to be Used.
Responsibil- ity.
Location of Office.
ARTICLE II.
MEMBERSHIP.
i. The membership of this Association shall be divided into three Membership classes, viz. : Members, Honorary Members and Associates.
(2) A Member shall be:
(a) Either a Civil Engineer, a Mechanical Engineer, an Electrical Engineer, or an official of a railway corporation, who has had not less than five (5) years' experience in the location, construction, maintenance or op- eration of railways, and who, at the time of application for membership, is engaged in railway service in a responsible position in charge of work con nected with the Location, Construction, Operation or Maintenance of a Railway; provided, that all persons who were Active Members prior to March 20, 1907, shall remain Members except as modified by Article II, Clause 9.
(b) A Professor of Engineering in a college of recognized standing.
23
Membership Qualifica- tions.
24
CONSTITUTION.
Honorary Membership Qualifica- tions.
Associate Membership Qualifica- tions.
Membership Rights.
Age Require- ment.
"Railway" Defined.
Changes in Classes.
Supply Men.
Transfers.
3. An Honorary Member shall be a person of acknowledged emi- nence in railway engineering or management. The number of Honorary Members shall be limited to ten.
4. An Associate shall be a person not eligible as a Member, but whose pursuits, scientific acquirements or practical experience qualify him to co-operate with Members in the advancement of professional knowledge, such as Consulting, Inspecting, Contracting, Government or other Engineers, Instructors of Engineering in Colleges of recognized standing, and Engineers of Industrial Corporations when their duties- are purely technical.
5. (a) Members shall have all the rights and privileges of the Association.
(b) Honorary Members shall have all the rights of Members, except that of holding office, and shall be exempt from the payment of dues.
(c) Associates shall have all the rights of Members,' except those of voting and holding office.
6. An applicant to be eligible for membership in any class shall not be less than twenty-five (25) years of age.
7. The word "railway" in this Constitution means one operated by steam or electricity as a common carrier, dependent upon transpor- tation for its revenue. Engineers of street railway systems and of rail- ways which are used primarily to transport the material or product of an industry or industries to and from a point on a railway which is a common carrier, or those which are merely adjuncts to such industries, are eligible only as Associates.
8. A Member, elected after March 20, 1007, who shall leave the railway service, shall cease to be a Member, but may retain membership in the Association as an Associate, subject to the provisions of Article II, Clause 9; provided, however, if he re-enters the railway service, he shall be restored to the class of Members. .
9. Persons whose principal duties require them to be engaged in the sale or promotion of railway patents, appliances or supplies, shall not be eligible for, nor retain membership in any class in this Association, except that those who were Active Members prior to March 20, 1907, may retain membership as Associates ; provided, however, that anyone having held membership in the Association and subsequently having be- come subject to the operation of this clause, shall, if he again becomes eligible, be permitted to re-enter the Association, without the payment of a second entrance fee.
10. The Board of Direction shall transfer members from one class to another, or • remove a member from the membership list, under the provisions of this Article.
ARTICLE III.
Charter Membership.
! ADMISSIONS AND EXPULSIONS. ,.
i'. The Charter Membership consists of all persons who were elected before March 15, 1900.
CONSTITUTION.
2. The Charter Membership having been completed, any person desirous of becoming a member shall make application upon the form prescribed by the Board of Direction, setting forth in a concise statement his name, age, residence, technical education and practical experience. He shall refer to at least three members to whom he is personally known, each of whom shall be requested by the Secretary to certify to a personal knowledge of the candidate and his fitness for membership,
. 3. Upon receipt of an application properly endorsed, the Board of Direction, through its Secretary, or a Membership Committee selected from its own members, shall make such investigation of the candidate's fitness as may be deemed necessary. The Secretary will furnish copies of t,he information obtained and of the application to each member of the Board of Direction. At. any time, not less than thirty days after the filing of the application, the admission of the applicant shall be. canvassed by letter-ballot among the members of the Board, and affirmative votes by two-thirds of its members shall elect the candidate; provided, how- ever, that should an applicant for membership be personally unknown to three members of the Association, due to residence in a foreign country, or in such a portion of the United States as precludes him from a sufficient acquaintance with its members, he may refer to well-known men engaged in railway or allied professional work, upon the form above described, and such application shall be considered by the Board of Direction in the manner above set forth,' and the applicant may be elected to membership by a unanimous vote of the Board.
4. All persons, after due notice from the Secretary of their elec- tion, shall subscribe to the Constitution on the form prescribed by the Board of Direction. If this provision be not complied with within six months of said notice, the election shall be considered null and void.
5. Any person having been a member of this Association, and hav- ing, while in good standing, resigned such membership, may be reinstated without the payment of a second entrance fee; provided his application for reinstatement is signed by five members certifying to his fitness for same, and such application is passed by a tv/o-thirds majority of the Board of Direction.
6. Proposals for Honorary Membership shall be submitted by ten or more Members. Each Member of the Board of Direction shall be fur- nished with a copy cf the proposal, and if, after thirty days, the nominee shall receive the unanimous vote of said Board, he shall be declared an Honorary Member.
7. When charges are preferred against a Member in writing by ten or more Members, the Member complained of shall be served with a copy of such charges, and he shall be called upon to show cause to the Board of Direction why he should not be expelled from the Association. Not less than thirty days thereafter a vote shall be taken on his expulsion, and he shall be expelled upon a two-thirds vote of the Board of Direction.
8. The Board of Direction shall accept the resignation, tendered in writing, of any Member whose dues are fully paid up.
Application for Member- ship.
Election to Membership.
Subscription to Constitu- tion.
Reinstate- ment.
Honorary Membership.
Expulsions.
Resignations.
26
CONSTITUTION.
ARTICLE IV.
i. An entrance fee of $10.00 shall be payable to the Association through its Secretary with each application for membership; and this sum shall be returned to the applicant if not elected.
2. The annual dues are $10.00, payable during the first three months of the calendar year.
3. Any person whose dues are not paid before April 1st of the cur- rent year shall be notified of same by the Secretary. Should the dues not be paid prior to July 1st, the delinquent Member shall lose his right to vote. Should the dues remain unpaid October 1st, he shall be notified on the form prescribed by the Board of Direction, and he shall no longer receive the publications of the Association. If the dues are not paid by December 31st, he shall forfeit his membership without further action or notice, except as provided for in Clause 4 of this Article.
4. The Board of Direction may extend the time of payment of dues, and may remit the dues of any Member, who, from ill-health, advanced age or other good reasons, is unable to pay them.
ARTICLE V.
OFFICERS.
i. The officers of the Association shall be Members and shall con- sist of:
A President,
A First Vice-President,
A Second Vice-President,
A Treasurer,
A Secretary,
Nine Directors, who, together with the five latest living Past-Presidents who are Members, shall constitute tbe Board of Direction in which the government of the Association shall be vested, and who shall act as Trustees, and have the custody of all property belonging to the Association.
2. The offices of First and Second Vice-Presidents shall be deter- mined by the priority of their respective dates of election.
3. The terms of office of the several officers shall be as follows :
President, one year. Vice-Presidents, two years. Treasurer, one year. Secretary, one year. Directors, three years.
4. (a) There shall be elected at each Annual Convention:
A President, One Vice-President, A Treasurer, A Secretary, Three Directors.
CONSTITUTION.
27
(b) The candidates for President and for Vice-President shall be selected from the members of the Board of Direction.
5. The office of President shall not be held twice by the same per- conditions of
son. A person who shall have held the office of Vice-President or R,e"®l.ection . „, . of Officers.
Director shall not be eligible for re-election to the same office until at
least one full term shall have elapsed after the expiration of his previous
term of office.
6. The term of each officer shall begin with his election and con- Term of
., , . . Officers,
tinue until his successor is elected.
7. (a) A vacancy in the office of President shall be filled by the Vacancies ir- * ir t> -a I m Offices, rirst Vice-President.
(b) A vacancy in the office of either of the Vice-Presidents shall be filled by the Board of Direction by election from the Directors. A Vice-Presidency shall not be considered vacant when one of the Vice- Presidents is filling a vacancy in the Presidency.
(c) Any other vacancies for the unexpired term in the membership of the Board of Direction shall be filled by the Board.
(d) An incumbent in any office for an unexpired term shall be eligible for re-election to the office he is holding; provided, however, that anyone appointed to fill a vacancy as Director within six months after the term commences shall be considered as coming within the pro- vision of Article V, Clause 5.
8. When an officer ceases to be a Member of the Association, as Vacation of
. Office
provided in Article II, his office shall be vacated, and be filled as provided
in Article V, Clause 7.
9. In case of the disability or neglect in the performance of his duty, ^ Neg/ect of an officer, the Board of Direction, by a two-thirds majority vote of the
entire Board, shall have power to declare the office vacant, and fill it as provided in Article V, Clause 7.
ARTICLE VI.
NOMINATION AND ELECTION OF OFFICERS.
1. (a) There shall be a Nominating Committee composed of the Nominating five latest living Past-Presidents of the Association, who are Members, Committee, and five Members not officers.
(b) The five Members shall be elected annually when the officers of the Association are elected.
2. It shall be the dutv of this committee to nominate candidates to £un\ber of
P3.ndlQ3.t6S
fill the offices named in Article V, and vacancies in the Nominating Com- mittee caused by expiration of term of service, for the ensuing year, as
follows : Number of Candi- Number of Candi- dates to be named dates to be elected Office to be Filled. by Nominating at Annual Election
Committee. of Officers.
President 1 1
Vice-President 1 1
Treasurer 1 1
Secretary 1 1
Directors 9 3
Nominating Committee 10 5
28
CONSTITUTION.
Chairman.
Meeting of Committee.
Announce- ment of Names of Nominees.
Additional Nominations by Members.
Vacancies in List of Nominees.
Ballots Issued.
Substitution of Names.
Ballots.
Invalid Ballots.
Closure of Polls.
Requirements for Election.
Tie Vote.
3. The Senior Past-President shall act as permanent chairman of the committee, and will issue the call for meetings. In his absence from meetings, the Past-President next in age of service shall act as Chairman pro tern, at the meeting.
4.: Prior to December 1st, each year, the Chairman shall call a meet- ing of the committee at a convenient place and, at this meeting, nominees for office shall be agreed upon.
5. The names of the nominees shall be announced by the permanent Chairman to the President and Secretary not later than December 15th of the same year, and the Secretary shall report them to the Members of the Association on a printed slip not later than January 1st following.
6. At any time between January 1st and February 1st, any ten or more Members may send to the Secretary additional nominations for the ensuing year signed by such Members.
7. If any person so nominated shall be found by the Board of Direc- tion to be ineligible for the office for which he is nominated, or should a nominee decline such nomination, his name shall be removed and the Board may substitute another one therefor ; and may also fill any vacancies that may occur in this list of nominees up to the time the bal- lots are sent out.
8. Not less than thirty days prior to each Annual Convention, the Secretary shall issue ballots to each voting member of record in ,good standing, with a list of the several candidates to be voted upon, with the names arranged in alphabetical order when there is more than one name for any office.
9. Members may erase names from the printed ballot list and may substitute the name or names of any other person or persons eligible for any office, but the number of names voted for each office on the ballot must not exceed the number to be elected at that time to such office.
10. (a) Ballots shall be placed in an envelope, sealed and endorsed with the name of the voter, and mailed or deposited with the Secretary at any time previous to the closure of the polls.
(b) A voter may withdraw his ballot, and may substitute another, at any time before the polls close.
11. Ballots not endorsed or from persons not qualified to vote shall not be opened; and any others not complying with the above provisions shall not be counted.
12. The polls shall be closed at twelve o'clock noon on the second day of the Annual Convention, and the ballots shall be counted by three tellers appointed by the Presiding Officer. The ballots and envelopes shall be preserved for not less than ten days after the vote is canvassed.
13. The persons who shall receive the highest number of votes for the offices for which they are candidates shall be declared elected.
14. In case of a tie between two or more candidates for the same office, the members present at the Annual Convention shall elect the officer by ballot from the candidates so tied.
CONSTITUTION. 29
15. The Presiding Officer shall announce at the convention the names Announce- of the officers elected in accordance with this Article. men "
16. Except as to the Past-Presidents, the first Nominating Com- First mittee and the three additional Directors provided for shall be appointed committee? by the Board of Direction, one of the Directors for one year one for
two years, and one for three years.
ARTICLE VII.
MANAGEMENT.
R? (a) The President shall have general supervision of the affairs of the Association, shall preside at meetings of the Association and of the Board of Direction, and shall be ex-officio member of all Committees, except the Nominating Committee.
(b) The Vice-Presidents, in order of seniority, shall preside at meet- ings in the absence of the President and discharge his duties in case of a vacancy in his office.
2.' The Treasurer shall receive all moneys and deposit same in the name of the Association, and shall receipt to the Secretary therefor. He shall invest all funds not needed for current disbursements as shall be ordered by the Board of Direction. He shall pay all bills, when properly certified and audited by the Finance Committee, and make such reports as may be called for by the Board of Direction.
3. The Secretary shall be, under the direction of the President and Board of Direction, the Executive Officer of the Association. He shall attend the meetings of the Association and of the Board of Direction, prepare the business therefor, and duly record the proceedings thereof. He shall see that the moneys due the Association are collected and with- out loss transferred to the custody of the Treasurer. He shall personally certify to the accuracy of all bills or vouchers on which money is to be paid. He is to conduct the correspondence of the Association and keep proper record thereof, and perform such other duties as the Board of Direction may prescribe.
4. The accounts of the Treasurer and Secretary shall be audited annually by a public accountant, under the direction of the Finance Com- mittee of the Board.
5. The Board of Direction shall manage the affairs of the Associa- tion, and shall have full power to control and regulate all matters not otherwise provided in the Constitution.
6. The Board of Direction shall meet within thirty days after each Annual Convention, and at such other times as the President may direct. Special meetings shall be called on request, in writing, of five members of the Board.
7. Seven members of the Board shall constitute a quorum.
8. At the first meeting of the Board after the Annual Convention, the following committees from its members shall be appointed by the President, and shall report to and: perform their duties under the super- vision of the Board of Direction :
Duties of President.
Duties of Treasurer.
Duties of Secretary.
Auditing of Accounts.
Duties of Board.
Board
Meetings.
Board l Quorum.
Board
Committees
30
CONSTITUTION.
Duties of
Finance
Committee.
Duties of
Publication
Committee.
Duties of
Library
Committee.
Duties of Committee or Outline of Work of Standing Committees.
Standing Committees.
Special Committees.
Discussion by Non- Memteers. Sanction of Acts of Board.
a. Finance Committee of three members.
b. Publication Committee of three members.
c. Library Committee of three members.
d. Outline of Work of Standing Committees of five members.
9. The Finance Committee shall have immediate supervision of the accounts and financial affairs of the Association; shall approve all bills before payment, and shall make recommendations to the Board of Direc- tion as to the investment of moneys and as to other financial matters. The Finance Committee shall not have the power to incur debts or other obli- gations binding the Association, nor authorize the payment of money other1 than the amounts necessary to meet ordinary current expenses of the Association, except by previous action and authority of the Board of Direction.
10. The Publication Committee shall have general supervision of the publications of the Association.
11. The Library Committee shall have general supervision of the Library, the property therein, and the quarters occupied by the Secretary; shall make recommendations to the Board with reference thereto, and shall direct the expenditure for books and other articles of permanent value, from such sums as may be appropriated for these purposes.
12. The Committee on Outline of Work of Standing Committees shall present a list of subjects for committee work during the ensuing year at the first meeting of the Board of Direction after the Annual Con- vention.
13. The Board of Direction may appoint such Standing Committees as it may deem best, to investigate, consider and report upon questions pertaining to railway location, construction or maintenance.
14. Special Committees to examine into and report upon any subject connected with the objects of this Association may be appointed from time to time by the Board of Direction.
15. The Board of Direction may invite discussions of reports from persons not members of the Association.
16. An act of the Board of Direction which shall have received the expressed or implied sanction of the membership at the next Annual Con- vention of the Association shall be deemed to be the act of the Associa- tion, and shall not afterwards be impeached by any Member.
Annual Convention.
Special Meetings.
ARTICLE VIII.
MEETINGS.
1. The Annual Convention shall begin upon the third Tuesday in March of each year, and shall be held at such place in the City of Chicago as the Board of Direction may select.
2. Special meetings of the Association may be called by the Board of Direction, and special meetings shall be so called by the Board upon request of thirty Members, which request shall state the purpose of such meeting. The call for such meeting shall be issued not less than ten days in advance, and shall state the purpose and place thereof, and no other business shall be taken up at such meeting.
CONSTITUTION.
31
3. The Secretary shall notify all members of the time and place of the Annual Convention of the Association at least thirty days in advance thereof.
4. Twenty-five Members shall constitute a quorum at all meetings of the Association.
5. (a) The order of business at annual conventions of the Associa- tion shall be as follows :
Reading of minutes of last meeting. Address of the President. Reports of the Secretary and Treasurer. Reports of Standing Committees. Reports of Special Committees. Unfinished business. New business. Election of officers. Adjournment.
(b) This order of business, however, may be changed by a majority vote of members present.
6. The proceedings shall be governed by "Robert's Rules of Order," except as otherwise herein provided.
7. Discussion shall be limited to members and to those invited by the presiding officer to speak.
Notification of Annual Convention.
Association Quorum.
Order of Business.
Rules of Order.
Discussion.
ARTICLE IX.
AMENDMENTS.
I. Proposed amendments to this Constitution shall be made in writ- Amendments ing and signed by not less than ten Members, and shall be acted upon in the following manner:
The amendments shall be presented to the Secretary, who shall send a copy of same to each member of the Board of Direction as soon as received. If at the next meeting of the Board of Direction a majority of the entire Board are in favor of considering the proposed amend- ments, the matter shall then be submitted to the Association for letter- ballot, and the result announced by the Secretary at the next Annual Convention. In case two-thirds of the votes received are affirmative, the amendments shall be declared adopted and become immediately effective.
Standing Commit- ters.
Special Commit- tees.
Personnel of Com- mittees.
Outline of Work.
General.
GENERAL INFORMATION.
(Subject to change from time to time by Board of Direction.)
GENERAL RULES FOR THE PREPARATION, PUBLICATION AND CONSIDERATION OF COMMITTEE REPORTS.
(a) appointment of committees and outline of work.
i. The following are standing committees: I. Roadway. II. Ballast.
III. Ties.
IV. Rail. V. Track.
VI. Buildings.
VII. Wooden Bridges and Trestles.
VIII. Masonry.
IX. Signs, Fences and Crossings. ,
X. Signals and Interlocking.
XL Records and Accounts
XII. Rules and Organization.
XIII. Water Service.
XIV. Yards and Terminals. XV. Iron and Steel Structures.
XVI. Economics of Railway Location. XVII. Wood Preservation. XVIII. Electricity. . XIX. Conservation of Natural Resources. ■•-,-..
2. Special Committees will be appointed from time to time,, as may be deemed expedient, in the manner prescribed by Article. ;VII, Clause 14, of the Constitution.
3. The personnel of all Committees will continue from year to year, except when changes are announced by the Board of Direction. . ,
4. As soon as practicable after each annual convention the^Boarql of Direction will assign to each Committee the important questions which, in its judgment, should preferably be considered during the cur- rent year. Committees are privileged to present the results of any spe- cial study or investigation they may be engaged upon or that may be considered of sufficient importance to warrant presentation.
(b) preparation of committee reports.
5. The collection and compilation of data and subsequent analysis in the form of arguments and criticism is a necessary and valuable pre- liminary element of committee work.
32
GENERAL INFORMATION.
'63
6. Committees are privileged to obtain data or information in any- proper way. If desired, the Secretary will issue circulars of inquiry, which should be brief and concise. The questions asked should be specific and pertinent, and not of such general or involved character as to pre- clude the possibility of obtaining satisfactory and prompt responses. They should specify to whom answers are to be sent, and should be in such form that copies can be retained by persons replying either by typewriter or blue-print.
7. Committee reports should be prepared as far as practicable to conform to the following general plan:
(a) It is extremely important that every Committee should ex- amine its own subject-matter in the "Manual" prior to each annual con- vention, and revise and supplement it, if deemed desirable, giving the necessary notice of any recommended changes in accordance with Clause 6 (a) of the General Rules for the Publication of the "Manual." If no changes are recommended, statement should be made accordingly.
(b) When deemed necessary, the previous report should be reviewed.
(c) Subjects presented in previous reports on which no action was taken should be resubmitted, stating concisely the action desired. It may not be necessary to repeat the original text in the report, reference to former publication being sufficient, unless changes in the previously published version are extensive. Minor changes can be explained in the text of the report.
(d) Technical terms used in the report, the meaning of which is not clearly established, should be defined, but defined only from the standpoint of railway engineering.
(e) If necessary, a brief history of the subject-matter under dis- cussion, with an outline of its origin and development, should be given.
(f) An analysis of the most important elements of the subject-matter should be given.
(g) The advantages and disadvantages of the present and recom- mended practices should be set forth.
(h) Illustrations accompanying reports should be prepared so that they can be reproduced on one page. The use of folders should be avoided as much as possible, on account of the increased expense and inconvenience in referring to them. Plans showing current practice, or necessary for illustration, are admissible, but those showing proposed definite design or practice should be excluded. Recommendatoins should be confined to governing principles.
Illustrations should be made on tracing cloth with heavy black lines and figures, so as to stand a two-thirds reduction ; for example : To come within a type page (4 inches by 7 inches), the illustration should be made three times the above size.
To insure uniformity, the one-stroke, inclined Gothic lettering is recommended.
Photographs should be clear and distinct silver prints.
Collection of Data.
Plan of
Reports
Definitions.
History. Analysis. Argument. Illustrations
34
GENERAL INFORMATION.
Conclusions.
Reports Required.
Date of
Filing
Reports.
Publication of Reports.
Written Discussions.
Verbal Discussions.
Sequence.
Plans showing current practice, or necessary for illustration, are admissible, but those showing proposed definite design or practice should be excluded. Recommendations should be confined to governing principles.
(i) The conclusions of the Committee which are recommended for publication in the Manual should be stated in concise language, logical sequence, and grouped together, setting forth the principles, specifications, definitions, forms, tables and formulas included in the recommendation. Portions of the text of the report which are essential to a clear interpre- tation and understanding of the conclusions, should be included as an integral part thereof.
(C) PUBLICATION OF COMMITTEE REPORTS.
8. (a) Reports will be required from each of the Standing and Special Committees each year.
(b) Although several subjects may be assigned to each Committee by the Board of Direction, a full report on only one subject is expected at each annual convention, but the preliminary work, on some of the remaining subjects should be in progress, and, when deemed advisable, partial reports of progress should also be presented. This method allows time for their proper preparation and consideration.
g. Committee reports to come before the succeeding convention for discussion should be filed with the Secretary not later than November, 30 of each year.
10. Committees engaged upon subjects involving an extended investi- gation and study are privileged to present progress reports, giving a brief statement of the work accomplished, and, if deemed expedient, a forecast of the final report to be presented.
11. Committee reports will be published in the Bulletin in such sequence as the Board of Direction may determine, for consideration at the succeeding convention. Reports will be published in the form pre- sented by the respective Committees. Alterations ordered by the conven- tion will be printed as an appendix to the report.
12. Committees should endeavor to secure written discussions of published reports. Written discussions will be transmitted to the respective Committees, and if deemed desirable by the Committee, the discussions will be published prior to the convention and be considered in connection with the report.
13. Each speaker's remarks will be submitted to him in writing be- fore publication in the Proceedings, for the correction of diction and errors of reporting, but not for the elimination of remarks.
(d) consideration of committee reports.
14. The sequence in which Committee reports will be considered by the convention will be determined by the Board of Direction.
GENERAL INFORMATION.
35
15. The method of consideration of Committee reports will be one Method, of the following:
(a) Reading by title.
(b) Reading, discussing and acting upon each conclusion sep-
arately.
(c) By majority vote, discussion will be had on each item.
Clauses not objected to when read will be considered as voted upon and adopted.
16. Action by the convention on Committee reports will be one of Final the following, after discussion is closed :
(a) Receiving as information.
(b) Receiving as a progress report.
(c) Adoption of a part complete in itself and referring re-
mainder back to Committee.
(d) Adoption as a whole.
(e) Recommittal with or without instructions. (1) Adoption as a whole. (g) Recommendation to publish in the Manual.
Action.
Note. — An amendment which affects underlying principles, if adopted, shall of itself constitute a recommittal of such part of the report as the Committee considers affected.
The Chair will decline to entertain amendments which in his opinion lie entirely within the duties of the Editor.
GENERAL RULES FOR THE PUBLICATION OF THE "MANUAL."
i. The title of the volume will be "Manual of the American Railway Engineering Association."
2. The Board of Direction shall edit the Manual and shall have authortiy to withhold from publication any matter which it shall consider as not desirable to publish, or as not being in proper shape, or as not having received proper study and consideration.
3. Matters adopted by the Association and subsequently published in the Manual shall be considered in the direction of good practice, but shall not be binding on the members.
4. The Manual will only include conclusions relating to definitions, specifications and principles of practice as have been made the subject of a special study by a Standing or Special Committee and embodied in a com- mittee report, published not less than thirty days prior to the annual con- A'ention, and submitted by the Committee to the annual convention, and which, after due consideration and discussion, shall have been voted on and formally adopted by the Association. Subjects which, in the opinion of the Board of Direction, should be reviewed by the American Rail- way Association, may be referred to that Association before being pub- lished in the Manual.
5. All conclusions included in the Manual must be in concise and proper shape for publication, as the Manual will consist only of a summary record of the definitions, specifications and principles of practice adopted by the Association, with a brief reference to the published Proceedings of the Association for the context of the Committee report and subsequent discussion and the final action of the Association.
6. Any matter published in the Manual may be amended or with- drawn by vote at any subsequent annual convention, provided such changes are proposed in time for publication not less than thirty days prior to the annual convention, and in the following manner : (a) Upon recommendation of the Committee in charge of the subject; (b) upon recommendation of the Board of Direction; (c) upon request of five members, made to the Board of Direction.
7. The Manual will be revised either by publishing a new edition or a supplemental pamphlet as promptly as possible after each annual con- vention.
36
BUSINESS SESSION
PROCEEDINGS.
The object of this Association is the advancement of knowledge pertaining to the
scientific and economic location, construction, operation and maintenance
of railways. Its actios is not binding upon its members.
TUESDAY, MARCH 19, 1912.
MORNING SESSION.
The Convention was called to order by Mr. W. C. Cashing. Chief Engineer Maintenance of Way, Pennsylvania Lines West of Pittsburgh, at 9:20 o'clock.
The President : — Gentlemen, please come to order.
The Thirteenth Annual Convention of our Association, now known for its first year under its new name, American Railway Engineering Association, ought to be an auspicious one, for was not "13" the number of the original States of our glorious Republic and "13" the number of letters in the motto of our State coat of arms, ''E Pluribus Unum," while, in one claw, the eagle holds thirteen sharp-pointed arrows, and in the other an olive branch with thirteen leaves? Moreover, the words "City of Chicago," which lends its hospitality for our meeting, contain thirteen letters.
The Committee on Arrangements has been untiring in its zeal, and we are certain that our program has been well-prepared, and that we will have an enjoyable time.
The Railway Age-Gazette and the Railway and Engineering Review will prepare Daily Editions, thus helping to keep up our interest and in- form us of the current events during the Convention. They are entitled to the gratitude and thanks of the members.
The privileges of the floor are extended to railway officials, engineers, and others not members of the Association, and they are cordially invited to participate in the discussions.
For the benefit of your fellow-members and the reporters, each speaker is requested, upon arising for recognition by the Chair, to state his name and the Company or College with which he is associated.
The first business to be attended to is the reading of the Minutes of the last Convention, but, as they have already been in print for some time, the reading will be dispensed with and the approval of the members considered as given, unless there is some objection.
There being no objection, the Minutes stand approved as printed.
Next in order is the report of the President.
39
40
BUSINESS SESSION.
PRESIDENT'S ADDRESS.
ASSOCIATION AFFAIRS.
To the Members of the American Railway Engineering Association:
At the last Annual Convention we numbered 967 Members, Honorary Members and Associates. During the year we have passed the 1,000 mark, although, naturally, our rate of growth has not been quite so rapid as in former years. As the date of our fiscal year has been changed from March to December 31st, it is difficult to make exact comparisons. The largest number of accretions in any one year was 124, in 1901, while in 1904 we had 104, and in 191 1, 98 new members. From last March to December 31, 191 1, only part of a year, 37 new members have joined.
During the first few years of the existence of the Association a com- fortable cash surplus was accumulated, but in the last three years the amount of printed matter issued has grown to such an extent that our ex- penditures have been in excess of our receipts, and the surplus has been drawn upon. The following table gives approximately the number of printed pages issued in each year since the beginning :
|
1899 |
1900 |
1901 |
1902|l903 |
1904 |
1905 |
1906 |
1907 |
1908 1909 |
1910 1911 |
Totals |
||||
|
54 |
54 |
|||||||||||||
|
172 |
513 |
430 |
1124 |
794 |
1028 |
1074 |
848 |
1302 2234 |
1990 |
1470 |
12979 |
|||
|
244 |
825 |
598 |
602 |
1000 |
9S0 |
942 |
768 |
970 1778 |
1412 |
19S2 |
12101 |
|||
|
210 |
316 |
522 |
1048 |
|||||||||||
|
44 |
36 |
36 |
44 |
48 |
48 |
80 |
78 |
62 |
82 |
558 |
||||
|
24 |
8 |
26 |
34 |
34 |
32 |
158 |
||||||||
|
Totals |
54 |
4161338 |
1072 |
1786 |
1838 |
2262 |
2064 |
1980 |
2378 4184 |
3498 |
4330 |
27140 |
||
You will observe from this that during the last four years 14,330 pages, or more than half the total, have been printed, exceeding the num- ber issued in the preceding nine years.
It was clear to your Board, therefore, that either the printing bill must be reduced, or the revenue increased, or both.
So far as increasing the revenues are concerned, your Board has been unwilling as yet to recommend an increase in annual membership dues, but is arranging for the present to obtain additional revenue by em- ploying an advertising agent to secure advertisements for the Bulletins and Program. It is estimated that this arrangement will net about $4,000 annually. The advertisements, and methods of obtaining them, will be closely supervised, but, nevertheless, the members of the Board are op- posed to the principle, and would not resort to it except in a case of emergency. It is hoped that the plan can be abolished at a future date, as in the case of the American Society of Civil Engineers.
With reference to reducing the expenditures, the Board has given a great deal of study to the question during the past year, and has made
BUSINESS SESSION. 41
some changes through the careful and energetic investigation of the Publication Committee and the Secretary.
First in importance is the Secretary's plan to avoid a reprinting of the reports for the Proceedings, after the Convention, by having a suffi- cient number of pages for the Proceedings printed at the same time as the Bulletins. The only disadvantage is that the discussions will be col- lected together at the end of the volume, instead of appearing at the end of the reports to which they refer, as in the past. This objection, how- ever, was not considered of sufficient importance in comparison with the saving in printing, which is estimated to be about $1,000.
In addition to the above, but 10 Bulletins a year instead of 12 will be issued, the May and June numbers being omitted. This is done be- cause it is usually difficult to obtain articles for them, and the Secre- tary is very busy during those months in preparing for the publication of the Proceedings. It is hoped that it will result in their earlier ap- pearance. Moreover, a reduction in the number of Bulletins to be printed will be made, so that it will be necessary for members to bring their copies with them to the Convention. Some extra ones will be provided for those who prefer to purchase them at cost.
Further economy is expected in postal rates by obtaining the second- class mail privilege, • application for which has been made to the Post- master-General. All the prescribed details have been complied with, among which is the altered appearance of the cover of the Bulletins. In this connection it was necessary to establish regular subscription rates for our Bulletins, and we are also now advertising in them the established prices for all of our publications. The estimated reduction of expense for postage by this arrangement is about $500. It is of interest to know that we could not come under the regulations for this privilege till our Association numbered 1,000 persons.
The question of the use of a thinner and lighter weight paper for our publications is now before the Board, and its adoption will probably result in some economy of postage expense. The transactions of the American Society of Civil Engineers are hereafter to be issued in one volume printed on India paper, but its use would not be economical for this Association, because a special paper is required for the illustrations.
For a good while the Board of Direction realized that the number of subjects reported on by committees was apt to be too many for thorough discussion on the floor, considering the large number of standing com- mittees, and introduced Rule 8-b for the preparation of committee reports, which limited the number to two for action by the Convention. A large number of subjects has always been assigned each year, so that the com- mittees could be collecting subject matter for other reports to be presented a year or more hence. When the increase in expenses became alarm- ing the Board found it necessary to have the President issue a special circular to committee chairmen, calling attention to the necessity for en- forcing the rule strictly this year. The several committees have re-
42 BUSINESS SESSION.
sponded heartily to the request, and the results of their conscientious and painstaking work is apparent in the valuable reports presented.
The ideal method of increasing our revenues (without resorting either to the augmentation of the annual dues or to advertising) would be to secure a larger membership, approximately double the present number, as the expense involved in issuing the Bulletins and Proceedings is not much more for a membership of 2,coo than for one of 1,000, while the revenue would be doubled. While we are pleased with the present num- ber of members, yet it is evident that many who are eligible and who would be most desirable confreres have not yet identified themselves with the Association.
In view of the unauthorized use of extracts from our Proceedings for advertising purposes by commercial agencies, your Board arranged for copyrighting all of our publications in the United States. It was not ex- pedient to do so in Canada.
At the last Convention important changes in our Constitution were adopted, among which were the shortening of the name, the establish- ment of a Nominating Committee, in order to place a larger share of the management in the hands of the members, and the addition of three members to the Board of Direction. During the past year it has been found desirable to make some changes in the "General Rules for the Prepara- tion, Publication and Consideration of Committee Reports," and the "General Rules for the Publication of the Manual," in order to make the work of the Association more expeditious and the papers and reports more valuable.
An invitation to send five delegates to the Third National Conserva- tion Congress at Kansas City on September 25, 26 and 27, 191 1, was ex- tended to the Association, and Messrs. W. S. Kinnear, John V. Hanna, John R. Leighty, H. S. Moore and J. A. L. Waddell were named.
An invitation was issued to your Association through the sub- department Secretaries of the Department of Commerce and Labor to participate with them, the Government engineers, and other engineering societies, in a conference for the purpose of unifying specifications for Portland Cement, and the invitation was accepted, the matter being put in the hands of Committee VIII — Masonry. We were advised by the Special Committee of the Departmental Conference that, on January 8, 1912, all parties had agreed to the preliminary specifications, except there was a difference of opinion as to whether the Vicat or Gilmore needles should be used for determining the time of setting. On January 17, the Committee of the American Society of Civil Engineers presented its final report, recommending the continued use of the Vicat needle for deter- mining consistency and time of setting, which was accepted.
The Assistant Purchasing Agent of the Isthmian Canal Commission has written our Secretary for our rules covering creosote treatment of lumber and piling.
An invitation was also sent to this Association to send a representa- tive to the convention of the International Association for Testing Ma- terials to be held in September, 1912, and we will accept it.
BUSINESS SESSION. 43
The Association has received from Mr. Willard A. Smith, President of the Railway and Engineering Review, a valuable contribution of photo- graphic views of the St. Gothard Railway in Switzerland, and another valuable contribution of a bound volume entitled "Railroad Transportation at the St. Louis World's Fair" from Mr. W. M. Camp, Editor of the same journal, both of which are in the Library.
Prof. W. F. M. Goss, Dean and Director of the University of Illi- nois, has tendered the use of data collected by the University, and the assistance of its staff, in the work of Committee XVI — Economics of Railway Location.
In 1910 the amount of money contributed by the American Railway Association for experiments and other work in connection with the study of the rail problem was $6,213.57, while the amount authorized by that Association for 191 1 is $10,000. The results of the study are published in the Bulletins as fast as completed. In this connection you are informed that the following letter has been received by your President from Judge Wm. J. Wood, Chairman, Railroad Commission of Indiana :
"The Railroad Commission of Indiana has about decided to commence a formal inquiry into the condition of steel now being put into the rail- road tracks of this State, involving, of course, a comparison of the steel now being constructed and that formerly used on the railroads of this State.
"I understand that your Association has had this matter up more than once, and I wish to have a conference with you about it in order, among other things, to have a suggestion from you, as to some person who could address a conference of Railroad Managers and Engineers, and other persons interested, held at Indianapolis under the direction of this Com- mission. Will you be in Chicago this week? I will thank you to advise me in reference to this subject, and whether or not I could meet you if I shall come there for that purpose.
"Yours very truly,
(Signed) "W. J. Wood, Chairman."
Your President called upon Judge Wood, and explained to him the work which Committee IV — Rail, has been doing.
At the meeting subsequently held on February 20, 1912, papers con- cerning the question of improvement of rail design and specifications were read by Messrs. P. H. Dudley (by representative), Thos. H. Johnson and W. C. Cushing, and, in addition, addresses were made by Messrs. F. A. Delano, E. J. Buffington, R. Montfort and Dr. Benjamin.
Your attention is called to the kindly expression of appreciation of our work in the editorial of the Railway and Engineering Review of October 28, 191 1, page 940, and the statement on "Railway and Engineer- ing Literature," page 944. These words should be a stimulus to further effort.
In the "Regulations adopted on December 28, 191 1, by the Superin- tendents of Buildings of all Five Boroughs of the City of New York," relative to reinforced concrete, clause No. 9, says that "Steel for rein- forcement of concrete shall meet the requirements of the standard speci- fications for steel reinforcement of the American Railway Engineering Association."
44 BUSINESS SESSION.
In addition to the above three authors of new books to be published have asked the authority of your Board of Direction to embody informa- tion contained in our Proceedings in their books.
From these instances it will be apparent that your work has attained such a value that information from it is now sought. The knowledge, ought to spur us on to constant improvement.
During the past year the third edition of the Manual has been issued. The comments on this volume by members and others have been quite complimentary. These compliments are deserved by the committees, Mr. Edwin F. Wendt, the Reviewer, Prof. Pence, the Editor, and your Secretary, Mr. E. H. Fritch.
It is our sad task to announce that we have lost several of our fellow-members by death during the past year :
Benjamin Douglas, late Tunnel Engineer, Detroit River Tunnel Com- pany, a charter member and an active worker on committees, was acci- dentally killed while inspecting a bridge in Brazil, South America.
W. D. Taylor, late Chief Engineer, Chicago & Alton Railroad, a brief sketch of whom was given in Bulletin 138.
Frank E. Simar, late Division Engineer, Canadian Northern Railway, at Duluth, Minn.
N. P. Curtis, late Instructor, University of Wisconsin, at Madison.
N. J. Gibbs, until recently engaged in construction work on the Pan- ama Canal. He was accidentally killed at Tomkins Cove, N. Y.
H. Pierce, late Engineer of Construction of the Chesapeake & Ohio Railway.
Lewis Kingman, late Office Engineer of the National Railways of Mexico.
John S. Metcalf, President of John S. Metcalf Co., Chicago.
PROGRESS IN ENGINEERING WORKS.
The year 191 1 has witnessed the continued progress, and in some cases the completion, of vast works of engineers. Governments, whether Federal, State or Municipal, continue their works in times of depressed business as well as in prosperous times, and, therefore, the three greatest government undertakings, the Panama Canal, the Catskill Aqueduct and the Erie Canal, have been pushed steadily forward.
Of these the Catskill Aqueduct, estimated to cost $162,000,000, is of high importance, for it is expected to carry ultimately the water supply for 20,000,000 people. It is a stupendous undertaking, measuring 92 miles in length, from the Ashokan Reservoir in the Catskill Mountains to New York City, and, in time, to be extended into Brooklyn and Staten Island. The daily delivery of water is to reach 500,000,000 gallons. In addition to the 55 miles of cut and cover, there will be 24 grade tunnels, aggre- gating 14 miles, 6 miles of steel pipe siphons and 17 miles of pressure tunnels, 7 in number. The pressure tunnels are circular, about 14 ft. diameter, and the one of greatest magnitude and difficulty is that under the Hudson at Storm King Mountain, 1,150 feet below the surface of the
BUSINESS SESSION. 45
ground. It was holed through last month in the presence of the Mayor of New York City and many others.
Another important government enterprise, which was brought to suc- cessful completion last March, is the Roosevelt Dam, in the canyon of the Salt River, about 70 miles east of Phoenix, Ariz., as it is for the purpose of impounding 418,000,000,000 gallons of water for irrigation. It is 276 feet high, with a crest length of 1,080 ft. It was begun in Septem- ber, 1906, and was estimated to cost about $3,850,000. Owing to its iso- lation, the cement used was manufactured at the site in a mill especially constructed for the work. The cost per barrel was $1.96, whereas, if shipped in, it would have been $9 per barrel.
Notwithstanding the depression in business, the year witnessed the continued progress, and also the completion, of some magnificent engi- neering works in the railway world.
The erection of the enormous and palatial station of the New York Central Lines in New York City has been finally started, after carrying on since 1903 a large amount of preliminary work of excavation, track laying and office building. This work has embraced about 3,000,000 cu. yds. of rock excavation, carried on under great difficulties, about 250,000 cu. yds. of concrete and about 60,000 tons of steel.
The tracks are on two levels, the suburban, 20 in number, about 49 ft. below the street level, and the express or through tracks, 22 in number, 20 to 25 feet above them.
On June 4, 191 1, the large new passenger station of the Chicago & Northwestern Railway in Chicago, costing about $24,000,000, was opened for service. Its style is Italian Renaissance, and it is built of gray Maine granite. The train shed has 16 tracks, and belt conveyors are used for conveying some of the incoming mail.
Identified with the name of one man, Henry M. Flagler, an enterprise entirely different from any other was brought to successful completion in the last week of December, 191 1, so far as the placing of the last batch of concrete was concerned. This is the famous ocean railway from Miami to Key West in Florida, 154 miles, of which 74 miles are on land, 25 miles on swamps and 55 miles over water or on the long line of islands that make up the Florida Keys. There are about 500 reinforced concrete segmental and semi-circular arches from 45 to 60 ft. span. The longest viaduct is 10,500 ft., between Long Key and Conch Key. It is a wonderful piece of work and several disasters from storms during the construction have been experienced. It was opened for public service January 22, 1912.
Another great railroad enterprise, estimated to cost $9,500,000, is the line and grade improvement of the Delaware, Lackawanna & Western Railroad, between Slateford, Pa., and Hopatcong, N. J., which was opened for traffic Christmas, 191 1. The old line was shortened from 39.57 miles to 28.45 miles, the grade reduced from 1.14 per cent, to .55 per cent., and the curvature from 6° 54' to 2°, except in the case of one of 3^2°, saving 1,560° of central angle. It was an unusually bold piece of work, and of
46 BUSINESS SESSION.
great magnitude. The grading consisted of 7,890,000 cu. yds. of earth ex- cavation, 6,502,000 cu. yds. of rock excavation and 16,000,000 cu. yds. of embankment. The Pequest fill, containing 6,625,650 cu. yds. of material, is probably the largest railroad embankment ever constructed, being 3 miles long and from 75 ft. to no ft. high. The total quantity of concrete is 266,900 cu. yds., and two of the bridges are magnificent reinforced con- crete arch viaducts, one over the Delaware River, and the other over the Paulins Kill. The first is 1,540 ft. long and 64 ft. high, and consists of five spans of 150 ft., two of 120, one of 53 and one of 50J/2 ft. The Paulins Kill viaduct is 1,100 ft. long and 117 ft. high, and has five spans of 120 ft. and two of 100 ft.
The Southern Pacific Railway also completed a line and grade change up the western slope of the Sierras from Rocklin, Cal., to Colfax, 30.8 miles on a 1.5 per cent, grade. There are 17 tunnels on the line
The Galveston Causeway, estimated to cost $1,615,000, was be^un in 1909, and is a structure a little more than 2 miles long, connecting Gal- veston Island, on which the city of that name stands, with the mainland, its main feature being a reinforced concrete viaduct 2,455 ft. long, consist- ing of twenty-eight 70 ft. arch spans and a lift span with a clear water- way of 109 ft. The viaduct portion is 66 ft. wide, and carries 2 railroad tracks, one electric railway track and a roadway of 19 ft. clear width. On the causeway embankment approaches there are more tracks, and the roadway widens to 40 ft. About 9,808 concrete sheet piles, making a con- tinuous strip 35 miles long, were required.
The work of introducing electric power on steam railroads was con- tinued, although in this case, the Hoosac Tunnel, it was of but limited extent. The work was begun October 3, 1910, and finished May 18, 191 1, at a cost of 1^4 millions. The electric system is the same as used by the New York, New Haven & Hartford, and the zone extends from a small tunnel just west of the North Adams Station to a point just east of the Hoosac Tunnel station, 21 miles of track being electrically operated. The tunnel is 4.75 miles long, and was opened in 1875. But lately the New Haven Company has made known its plan to change the main line from Stamford to New Haven to electric traction at an early date, at an esti- mated cost of $7,000,000.
Last April it was announced that a beginning had been made on the last of the $160,000,000 worth of improvements started in 1903 by the Pennsylvania Railroad Company, viz : the New York Connecting Rail- road, which will link the Pennsylvania and New Haven roads together. This link will be 12 miles long, the principal feature of which will be the four-track bridge from Astoria on Long Island over Hell Gate, Ward's and Randall's Islands to Mott Haven or Port Morris. The bridge over Hell Gate and its approaches will be about 3 miles long, and will be of most massive construction, costing about $20,000,000. The main span is a steel arch 1,020 ft. long and 140 ft. above mean water level, making an imposing gateway for the East River entrance to New York Harbor.
Great engineering works are not confined to this country. The Swiss
:'. BUSINESS SESSION. 47
railway engineers have been obliged, by the rugged nature of their coun- try, to resort to long and ingenious tunnel building, in order to prevent their land from becoming a barrier to international transportation. The world's longest tunnels have been built there, the Simplon, 12.4 miles long; the St. Gothard, 9.5 miles long, and the past year witnessed the piercing of the third longest, the Loetschberg, 9 miles long. They also have the first, Mont Cenis, 7.5 miles long, begun in 1857, and the Arlberg, 6.5 milet long. In the case of many of these tunnels, gain in elevation in short ins- tances has been obtained by the use of the spiral, making the journey over the railway most fascinating, interesting and beautiful.
The Loetschberg Tunnel is built to put the capital, Bern, on the main line from Milan, Italy, to Paris and Calais in France, while at the same time the distance is shortened by 80 miles to 675 miles. It was originally planned to be straight, but a disastrous inrush of water from the Kander River, burying 25 men, compelled the contractors to wall it up and build a detour with two short curves. The record of tunnel driving has been made in this work, a start being made November 1, 1906, while the head- ings met March 31, 191 1.
The increased daily rate of tunnel driving due to improved methods and machinery is well illustrated in these Swiss tunnels.
The rate at the M'ont Cenis, begun in 1857, was 7.75 ft. per day, two headings.
The rate at the St. Gothard, begun in 1872, was 18 ft. per day, two headings.
The rate at the Arlberg, begun in 1880, was 27.25 ft. per day, two headings.
The rate at the Simplon, begun in 1893, was 36 ft. per day, two head- ings.
The rate at the Loetschberg, begun in 1906, was 29.5 ft. per day, one heading, while a maximum for one day with one heading was 36 ft.
The Panama Canal continues to> be the most costly and most stupen- dous enterprise now in progress, and its engineers are earning a monu- ment of fame for themselves. The Special Commissioner to "The Engi- neer" of London, Mr. Percy F. Martin, F.R.G.S., who visited the Canal in 1910, makes this statement in the issue of June 9, 191 1: "When the Canal shall be pronounced completed, and the huge lock gates swing open for the first time to receive the earliest vessel, a chorus of acclamation and congratulation will ascend such as probably no human achievement has ever yet called forth. And justifiably so."
In Engineering News for February 17, 1910, the following appeared:
THE COMPLETE ENGINEER OF 30O YEARS AGO.
"Wrapped in the stoutest of manila paper and deposited on the shelves of the library of the American Society of Civil Engineers is a book, the gift of Mr. W. A. Haven, M. Am. Soc. C. E., which is probably one of the earliest of printed books in the English language treating of the art of science of engineering. On a curiously embellished title page is the following caption :
48 BUSINESS SESSION.
" 'A Practical Abstract of the Arts of Fortification and Assailing
* * * Written for the benefit of such as delight in the Practice of
those Noble Arts. By David Papillon Gent : * * * London Printed
by R : Austin and are to be sould at the south side of the Exchange &
in Popes head Alley 1645.'
"Engineering in that day, and for a century or so after, was entirely a military accomplishment, and so the science discussed by the author did not embrace any of the civil arts which were later a part of the en- gineer's knowledge, but prefacing the more serious work there is a chap- ter on (The True Character of a Complete Engineer) which will appeal even to the modern engineer. Especially will the last paragraph of this chapter touch a tender spot in the heart of every engineer who has had to argue against all reason with the lawyer, director or business man who can see in engineering only a superior sort of craftsmanship which, in its fundamentals, should be knowledge easily deduced by themselves. The major portion of this first chapter follow:
" 'of the true character of a complete engineer.
" '(1) He is to be religious for the fear of the Lord is the beginning of wisdom.
"'(2) He is to be a souldier for none can better judge of the suffi- diency or insufficiency of fortification. * * *
"'(3) He is to be a traveller; for he that hath not seen variety of works, and the excellency of foreign Fortifications, cannot perceive the defects of ours, nor give directions to rectify them.
"'(4) He is to be well versed in the Arithmetike for his calcula- tions; in the Geometry, for the setting out of all superficies; in the Architecture, for to direct all manner of artificers ; and in the other parts of the Mathematikes, for the taking of distances, depths and elevations, and for the inventing and contriving of all manner of Engines and ma- chines.
" '(5) He is to be wise in all his proceedings, punctual in all his promises, careful and diligent in his calling, and rather inclined to aus- terity with lenity, or otherwise he will never be respected, served or obeyed.
"'(6) He is to be of solid judgment and quick of apprehension to judge aright of the defects and advantages of places. * * * He is not to give account of his actions to any,- but to the Generall, or to the lieu- tenant Generall of the Ordnance if he be in an Army, or in a Garison, only to the grand Committee, and to the Governour; and as for all other kinds of men, inhabitants, souldiers or officers; he is not bound to ex- postulate the case, if they demand of him reasons for any thing he directs or commands to be done; neither ought he if he regards his reputation, and makes conscience of his ways, to comply * * * with the humour of the greatest in authority, or be led to assent to any resolution, that is against the maxims of his Art, by the Logical and Sophisticall reasons and arguments of Scholars or Church-men ; for some of them are now a days overbusie in things that go beyond their element, and endeavor to over-sway Artists by rhetorike, considering not that their reasons are no reasons at all to the reasons of Art. And this last quality is the essen- tiall part of a good Engineer ; for all the other are but to small purpose without this.' "
Fellow members : Many of the engineers engaged in the huge enter- prises briefly outlined in the foregoing pages, and in other work, too, not mentioned, will measure up with "The Complete Engineer of 300 Years Ago." (Applause.)
BUSINESS SESSION. 49
The President :■ — I desire to read the following extract from a letter from Mr. Edwin F. Wendt, Chairman of the Publication Committee, as it gives additional information to that which I have given in the report:
"The work of the Publication Committee for the year may be con- sidered as finished.
"The Secretary reports that the paper stock for Proceedings has been imported from Europe and is now in Chicago. The results from the use of this paper have been very satisfactory and the Secretary reports that all experience with this paper so far demonstrates the wisdom of its selection. It is particularly gratifying to know that it will be feasible and practical to bind the 1,600 pages of our Proceedings into one vol- ume, winch will be No. 13. The advantages of this practice will be:
"A saving in shelf room in libraries.
"The elimination of one volume of our Proceedings.
"A reduction in costs of binding.
"It is probable that the 1912 Proceedings will be available in paper binding by May 1. Cloth bound copies will likely be ready June 1. When our next Proceedings have been issued and all of our printing bills have been paid, the Board of Direction will have reason to congratulate itself by reason of the reduction in expenses of printing, binding and mailing. The Secretary, as usual, has followed this work in detail with the great- est care and we are fortunate in having as Secretary a man who is capable, energetic and loyal in the highest degree.
"Another subject needs some comment at this time. Our Advertising Representative has not been successful in making contracts for advertis- ing, either for the Bulletins or the Official Program of the Convention. This is a matter for regret as we had confidently calculated upon a net return from the Program, especially. After a conference between the Advertising Representative ana Mr. Fritch, it was decided by the Secretary and myself that it would be proper, and even satisfactory to the Adver- tising Representative, for the Secretary to make his usual effort to obtain advertising for the Program which will be issued this week before the Convention."
The President: — The next order of business is the Secretary's and Treasurer's reports.
(Secretary E. H. Fritch then read the following reports:)
50 BUSINESS SESSION.
SECRETARY'S REPORT.
To the Members of the American Railway Engineering Association:
I have the honor to present the following report for the period ending December 31, 1911, and from January 1, 1912, to March 15, 1912:
MEMBERSHIP.
Total Membership at last annual convention, March 15, 1911 967
Additions during the year, 95 95
1,062
Deceased Members 7
Withdrawals during the year 13
Dropped for non-payment of dues 12
32 32
Total membership March 15, 1912 1,030
Consisting of:
Members 939
Honorary Members 4
Associates 87
1,030
GEOGRAPHICAL DISTRIBUTION.
The geographical distribution of the membership is indicated in the following table :
United States 899 Korea 1
Dominion of Canada 83 Panama 1
Mexico 9 Australia 1
Cuba 5 Great Britain 1
China 6 Peru 2
New Zealand 4 Russia 1
Philippine Islands 3 Central America 2
India 2 Porto Rico 1
Bolivia 1
Japan 3 Total 1,030
BUSINESS SESSION.
Si
CLASSIFICATION OF MEMBERS.
Presidents zz
Assistant to President 2
Vice-Presidents z"j
General Managers 20
Dir. Maint. and Operation.... 1
Asst. General Managers 8
General Superintendents 16
Asst. General Superintendent. 1
Division Superintendents 38
Chief Engineers 121
Asst. Chief Engineers 16
Principal Asst. Engineers [4
Chief Eng. Maint. of Way.... 5
Asst. Chief Eng. M. of Way. 5
Engineers of Construction.... 14
Engineers Maint. of Way 86
Bridge Engineers Z/
Engineers Surveys 1
Division Engineers 86
Assistant Engineers 1 1 1
District Engineers 13
Electrical Engineers 2
Inspecting Engineers 14
Supervising Engineers 1
Architects 4
Locating Engineers 3
Engineers Track Economics. . . 1
Engineers Track and Roadway 4
Maintenance of Way Acct. ... 1
Engineers Bridges and Bldgs. 7
Office Engineers 5
Chief Draftsmen 4
General Roadmasters 2
Roadmasters 16
Master Carpenters 2
Rail Expert 1
Supt. Bridges and Buildings.. 9
Supervisors 2
Resident Engineers 36
Signal Engineers 18
Assistant Signal Engineer 1
Managers Timber Dept 6
Chief Timber Inspector 1
Forester 3
Contracting Engineers 13
Supervisor Materials 1
Chemists and Engineers Tests. 4
Metallurgical Engineers 4
Professors in Colleges 19
Associate Professors 16
Civil Engineers 50
Consulting Engineers 89
General Foreman Water Works 1
Engineer Grade Elimination. . 4
Purchasing Agent 1
Receivers 3
Editors 3
Inspector Maintenance 3
Masonry Engineer
Asst. Superintendents
Engineers Valuation
Drainage Engineer
General Agent
Engineer Water Service...
Municipal Engineers 6
Commercial Engineer 1
Miscellaneous 26
Totals 1,030
PUBLICATIONS.
During the year the following publications have been issued by the Association : 12 Bulletins.
Proceedings for 191 1 (Parts 1 and 2).
1 Edition of the Manual.
2 Editions of Specifications for Plain and Reinforced Concrete and
Steel Reinforcement. 1 Edition of Conventional Signs.
Program for the Thirteenth Annual Convention.
52 BUSINESS SESSION.
The table below indicates the number of pages, illustrations, etc., of the publications issued :
No. Half- Folding Dia-
Pages. Tones. Plates grams. Tables. Forms.
Bulletins 1740 440 20
Proceedings 135.2 82 8
Manual 525 55 5 264
Steel Specifications. 34
Concrete Specific. 15
Conventional Signs 15 30
Program 56
|
240 |
35i |
|
306 |
219 |
|
264 |
44 |
|
3 |
2 |
|
1 |
1 |
|
no |
3737 607 33 924 61;
FINANCIAL STATEMENT.
Balance cash on hand March 15, 191 1 $13,216.6^
Consisting of:
Ten Railroad Bonds, as follows : Four St. Louis Southwestern Railway Company Bonds, par value $1,000 each, at cost $ 3,319.31
Six Lake Shore & Michigan Southern Rail- way Company Bonds, par value $1,000 each,
at cost 5,660.25
Cash in bank 4,237.06
$13,216.62
Receipts during the year :
March 16, Jan. 1, 1912, Totals 1911, to to for One
Dec. 31, 1911. Mar. 15, 1912. Year.
From Members, dues, etc $ 5,274.48 $ 8,567.35 $13,841.83
From Others, sales of publications,
advertising, etc 6,853.59 1,394.91 8,248.50
From American Railway Association,
account Rail Committee Expense. 6,495.57
From Interest 295.72
From Loan 1,000.00
From Proceeds of Sale of Bonds.... 3,797-33
|
508.56 |
7,004.13 |
|
67.62 |
363-34 |
|
1,000.00 |
|
|
3,797-33 |
Totals $23,716.69 $10,538.44 $34,255.13
Expenditures during the year:
March 16, 191 1, to Dec. 31, 191 1 $26,650.64
January 1, 1912, to March 15, 1912 2,719.02
Total Expenditures $29,369.66
BUSINESS SESSION. 53
Summary.
March 16, Jan. i, 1912,
191 1, to to
Dec. 31, 1911. Mar. 15, 1912.
Receipts $23,716.69 $10,538.44 $34,255.13
Expenditures 26,650.64 2,719.02 29,369.66
Total $ 4,885.47
Less amount of proceeds from sale of bonds 3,797-33
Net Excess of Receipts over Expenditures $ 1,088.14
EXPENDITURES IN DETAIL.
March 16, Jan. 1, 1912, Totals
Items. 1911, to to for One
Dec. 31, 191 1. Mar. 15, 1912, Year.
Stationery and Printing $ 298.20 $ 66.66 $ 364.86
Proceedings 4,842.18 .25 4,842.43
Bulletins 4,i5i-6i 366.54 4,518.15
Manual 2,187.79 2,187.79
Postage 784.20 189.87 974-07
Salaries 3,593-30 746.66 4-339-90
Officers Expenses 19.00 16.50 35-50
Annual Meeting 1,220.93 1,220.93
Telephone and Telegrams 67.41 20.24 87.65
Rents 600.00 120.00 720.00
Expressage 524.46 28.53 552-99
Exchange 23.20 2.40 25.60
Supplies 220.06 36.18 256.24
Light 12.79 6.15 18.94
Miscellaneous 75.91 9.85 85.76
Badges 80.00 80.00
Commission on Advertising 76.25 76.25
Impact 1,048.96 1,048.96
Rail Committee 5,850.70 936.26 6,786.96
Committee Expenses H7-44 16.68 I34-T2
Repayment of Loan 1,000.00 1,000.00
Interest on Loan 12.50 , 12.50
Total $26,650.64 $2,719.02 $29,369.66
Respectfully submitted,
E. H. Fritch, Secretary.
54 BUSINESS SESSION.
TREASURER'S REPORT.
To the Members of the American Raikvay Engineering Association: I have the honor of presenting the following report :
Balance Cash on hand, March 15, 191 1 $13,216.62
Consisting of:
Ten railroad bonds, as follows : Four St. Louis Southwestern bonds, par value,
$1,000 each, at cost. $ 3,319.31
Six L. S. & M. S. Ry. bonds, par value,
$1,000 each, at cost 5,660.25
Cash in Bank 4,237.06
Total $13,216.62
Receipts from all sources, March 16, 1911, to Dec. 31, 1911 $23,716.69
Receipts from all sources, Jan. 1, 1912, to March 15, 1912 10,538.44
Total Receipts for the year $34,255.13
Expenditures :
March 16, Jan. 1, 1912, 1911,10 to
Dec. 31, 1911. Mar. 15, 1912. Paid on audited vouchers $25,602.96 $ 3,766.70 $29,369.66
Balance to credit $ 4,885.47
Less proceeds from sale of four L. S. & M. S. bonds 3,797-33
Net Excess of Receipts over Expenditures $ 1,088.14
Composition of Balance, March 15, 1912:
Cash in bank $ 8,836.43
Cash on hand, checks, etc 286.10
Four St. Louis Southwestern bonds, at cost 3,319-31
Two L. S. & M. S. bonds, at cost 1,886.75
Total Cash Assets, March 15, 1912 $14,328.59
The bonds above listed are registered in the name of the Association and have been placed in a safety deposit box in the Merchants' Loan and Trust Company's vaults, Chicago.
Respectfully submitted,
Geo. H. Bremner, Treasurer.
The President : — What is your pleasure in regard to the reports of the Secretary and the Treasurer?
Mr. W. H. Elliott : — I move the acceptance of the reports.
(The motion was carried.)
The President : — There has been prepared for our benefit by the National Railway Appliances Association an unparalleled exhibit of rail-
BUSINESS SESSION. 55
way appliances in the Coliseum, on Wabash Avenue, and in order to allow the members time to visit it, it has been decided to adjourn at 4 p. m. to-day. The exhibit is more complete and larger than ever, so that it has been necessary to use the adjacent armory building this year. There will be no evening session.
The members are requested, as usual, to be early in the purchase of dinner tickets, which will be on sale this afternoon in the lobby outside of this room. You all know, from what has been said in previous years, that we have to give the necessary information to the hotel people in order that they may make the necessary preparations.
The next order of business is the presentation of the reports of the Standing and Special Committees. The members of committees will please take their places on the platform when their names are called by the Secretary. If all the reports assigned for any one day are finished before the time of adjournment, the first report assigned for the following day may be brought before the Association in order to advance the work of the convention.
We will now take up the report of the Committee on Rules and Or- ganization. Mr. Jos. O. Osgood, the Chairman of the Committee, at the last minute was prevented from coming here, so that he has not had an opportunity to fully instruct the other members of his Committee as to the preliminary announcement. Mr. F. D. Anthony will be kind enough to state the general work of the Committee in order that the report of the Committee may be discussed.
(The report of the Committee on Rules and Organization was pre- sented by Mr. F. D. Anthony, a member of the Committee. See report, pp. 65-68; discussion, pp. 919-931.)
The President : The next report is that of the Committee on Signals and Interlocking, of which Mr. A. H. Rudd is Chairman. In the absence of the Chairman, Mr. L. R. Clausen, the Vice-Chairman, will present the report.
(The report of the Committee on Signals and Interlocking was pre- sented by Mr. L. R. Clausen, the Vice-Chairman. See report, pp. 69-76 ; discussion, pp. 932, 933.)
The President : — The next report is that of the Committee on Iron and Steel Structures, of which Mr. C. H. Cartlidge is Chairman. We will ask the Chairman of the Committee to make the opening statement.
(The report of the Committee on Iron and Steel Structures was pre- sented by Mr. C. H. Cartlidge, the Chairman. See report, pp. 81-88;. dis- cussion, pp. 934-945.)
AFTERNOON SESSION.
The President : — The report of the Committee on Wooden Bridges and Trestles will next be disposed of. Mr. C. C. Went worth, the Chair- man, will make the opening statement.
56 BUSINESS SESSION.
(The report of the Committee on Wooden Bridges and Trestles was presented by Mr. C. C. Wentworth, the Chairman. See report, pp. 71-80 ; discussion, page 946.)
The President : — The next report is that of the Committee on Ballast, of which Mr. H. E. Hale is Chairman. The Chair will ask Mr. Hale to- make the opening statement.
(The report of the Committee on Ballast was presented by Mr. H. E. Hale, the Chairman. See report, pp. 95-300; discussion, pp. 949, 950.)
The President : — The next report is that of the Committee on Ties, of which Mr. L. A. Downs is Chairman. Mr. Downs will make the opening statement for the Committee.
(The report of the Committee on Ties was presented by Mr. L. A. Downs, the Chairman. See report, pp. 301-370; discussion, pp. 951-964.)
The President: — The next report is that of the Committee on Track, of which Mr. J. B. Jenkins is Chairman. Mr. Jenkins will make the pre- liminary statement for the Committee.
(The report of the Committee on Track was presented by Mr. J. B. Jenkins, the Chairman. See report, pp. 371-386; discussion, pp. 965-980.)
The President: — We will now adjourn, and the remaining questions will be taken up in the morning on the length of switches and also the specifications.
(Adjourned until 9 o'clock a. m., Wednesday.)
WEDNESDAY, MARCH 20, 1912.
MORNING SESSION.
The President: — Before taking up the regular order of business, the Chair would ask the unanimous consent of the Association to vary slightly from the program in order to be able to announce the results of the election of officers at the close of the afternoon session. The Chair will appoint as Tellers the following members : C. H. Spencer, C. H. Fisk and W. J. Bergen. The Secretary will turn over the ballots to the Tellers after the noon adjournment. The Tellers will retire to the anteroom and prepare their report. The polls will close at twelve o'clock to-day. This room has been engaged for some banquet this evening, and as an accommodation to the hotel they would like to have us adjourn between four-thirty and five o'clock if we can possibly do so, in order that they may have the room so as to prepare for the banquet.
This evening our annual dinner is to commence promptly at seven o'clock, and the members are urgently requested to be at the banquet hall before seven o'clock, so that we can begin promptly at seven.
The further consideration of the report of the Committee on Track will now be taken up. The consideration of the report was suspended last evening while we were discussing conclusion 3 on page 374, with reference to the lengths of switches and number of frogs, and this question is now
BUSINESS SESSION. 57
open for discussion. Mr. Jenkins, the Chairman of the Committee, will continue the presentation of the report.
The next report is that of the Committee on Yards and Terminals, of which Mr. C. H. Spencer is Chairman. The Chairman will make the pre- liminary announcement.
(The report of the Committee on Yards and Terminals was presented by Mr. C. H. Spencer, the Chairman. See report, pp. 89-92; discussion,
PP. 947, 948.)
The President: — The next report is that of the Committee on Rail, Mr. Chas. S. Churchill, Chairman. The Chairman is requested to make the preliminary statement.
(The report of the Committee on Rail was presented by Mr. Chas. S. Churchill, the Chairman. See report, pp. 559-862; discussion, pp. 1017-1038.)
The President :^The next report is that of the Committee on Road- way. In the absence of the Chairman, Mr. W. M. Dawley, the Vice-Chair- man, will make the preliminary statement.
(The report of the Committee on Roadway was presented by Mr. W. M. Dawley, the Vice-Chairman. See report, pp. 387-400; discussion, pp. 981, 982.)
The President : — The next Committee is that on Water Service, Mr. Robert Ferriday, Chairman. The Chairman will make the opening re- marks in regard to the report.
(The report of the Committee on Water Service was presented by Mr. Robert Ferriday, the Chairman. See report, pp. 421-428; discussion, pp 983-988.)
AFTERNOON SESSION.
The President :— The next report is that of the Committee on Masonry, of which Mr. Geo. PI. Tinker is Chairman. Mr. Tinker will make the opening statement.
(The report of the Committee on Masonry was presented by Mr. Geo. H. Tinker, the Chairman. See report, pp. 459-504; discussion, pp. 990-995O
The President: — The next report is that of the Committee on Records and Accounts, of which Mr. H. J. Pfeifer is Chairman. The Chairman will make the preliminary statement.
(The report of the Committee on Records and Accounts was pre- sented by Mr. H. J. Pfeifer, the Chairman. See report, pp. 505-507; dis- cussion, pp. 946, 947.)
The President: — The next report is that of the Committee on Elec- tricity, of which Mr. George W. Kittredge is Chairman. Mr. Kittredge will make the preliminary statement for the Committee.
(The report of the Committee on Electricity was presented by Mr. George W. Kittredge, the Chairman. See report, pp. 509-558 ; discussion, pp. 998-1016.)
58 BUSINESS SESSION.
The Chair expected to announce the result of the election to-night, but the Committee is still counting the ballots and he will, therefore, be unable to do so until to-morrow.
Some members have expressed a desire to visit the cement plants at Buffington and the steel plants at Gary, Indiana. Arrangements have been made for a trip of inspection Friday morning.
No more reports will be taken up this evening, and a motion to ad- journ is in order.
(On motion the meeting was adjourned until 9 a. m., Thursday.)
THURSDAY, MARCH 21, 1912.
.MORNING SESSION.
The President : — The first business this morning will be the report of the Committee on Conservation of Natural Resources, Mr. E. O. Faulkner, Chairman. In the absence of Mr. Faulkner, the report will be presented by Mr. William McNab, the Vice-Chairman.
(The report of the Committee on Conservation of Natural Resources was presented by Mr. William McNab, the Vice-Chairman. See report, pp. 429-458; discussion, page 989.)
The President : — The next report is that of the Committee on Signs, Fences and Crossings, Mr. C. H. Stein, Chairman.
(The report of the Committee on Signs, Fences and Crossings was presented by Mr. C. H. Stein, the Chairman. See report, pp. 900-904; dis- cussion, pp. 1055-1057.)
The President : — The next report is that of the Committee on Build- ings, of which Mr. Maurice Coburn is Chairman. Mr. Coburn will make the opening statement.
(The report of the Committee on Buildings was presented by Mr. Maurice Coburn, the Chairman. See report, pp. 885-889; discussion, page 1054.)
The President : — The Committee on Uniform General Contract Forms will please come forward. Mr. W. G. Atwood, the Vice-Chairman, will make the statement of the work of this Committee.
(The report of the Committee on Uniform General Contract Forms was presented by Mr. W. G. Atwood, the Vice-Chairman. See report, pp. 907-916; discussion, pp. 1 059-1076.)
The President : — The next report is that of the Committee on Economics of Railway Location), of which Mr. A. K. Shurtleff is Chair- man. Mr. Shurtleff will make the opening statement.
(The report of the Committee on Economics of Railway Location was presented by Mr. A. K. Shurtleff, the Chairman. See report pp. 905, 906: discussion, page 958.)
. The President : — The next Committee is the Special Committee on Grading of Lumber, Dr. Hermann von Schrenk, Chairman. We will hear from Dr. von Schrenk.
BUSINESS SESSION. 59
(The report of the Special Committee on Grading of Lumber was pre- sented by Dr. Hermann von Schrenk, the Chairman. See report, pp. 873- 884: discussion, pp. 1052, 1053.)
The President: — The next report is the Committee on Wood Preser- vation. Mr. Earl Stimson is the Chairman. We will have the opening statement by Mr. Stimson.
(The report of the Committee on Wood Preservation was presented by Mr. Earl Stimson, the Chairman. See report, pp. 863-872; discussion, pp. 1030- 105 1.)
The President: — We have finished the business in connection with the reports of Special and Standing Committees, and under the heading of "New Business" there are some resolutions to be offered.
Mr. J. B. Berry (Chicago, Rock Island & Pacific) : — I would suggest action by the members of this Association on the following resolutions :
'"Resolved, by the members of the American Railway Engineering Association in convention assembled, that we desire to place on record our hearty appreciation of the efforts made and the admirable results ob- tained by the Railway Age Gazette in its daily issue during this conven- tion.
"Resolved, that the cordial thanks of the Association be extended to its managing officers and editorial staff.
"Resolved, that a copy of these resolutions be spread upon the Minutes of this convention and a copy transmitted to the Railway Age Gazette."
I submit the foregoing resolutions for adoption by the Association. (The resolution was unanimously adopted.) Mr. Berry: — I offer the following resolutions:
"Resolved, by the members of the American Railway Engineering Association in convention assembled, that we desire to place on record cur hearty appreciation of the efforts made and the admirable results ob- tained by the Railway and Engineering Review in its daily issue during this convention.
"Resolved, that the cordial thanks of the Association be extended to its managing officers and editorial staff.
"Resolved, that a copy of these resolutions be spread upon the Min- utes of this convention and a copy transmitted to the Railway and En- gineering Review."
(The resolution was unanimously adopted.)
Mr. Chas. S. Churchill (Norfolk & Western) : — I offer the following resolutions :
"Resolved, by the members of the American Railway Engineering Association, in convention assembled, that we desire to place on record our appreciation of the efforts made by the National Railway Appliances Association in making possible the most admirable and instructive exhibit of devices and materials used in the construction, operation and mainten- ance of railways, and of the educational value of the exhibition.
"Resolved, that the thanks of the members of this Association be ex- tended to the officers and members of the National Railway Appliances Association for courtesies and facilities placed at our disposal during the convention.
60 BUSINESS SESSION.
"Resolved, that a copy of these resolutions be forwarded to the offi- cers of the National Railway Appliances Association, and that they be spread upon the Minutes of this convention."
(The resolutions were unanimously adopted.)
Mr. Edwin F. Wendt (Pittsburgh & Lake Erie) :— I offer the follow-, ing resolution :
"Resolved, that the hearty thanks of the members of the American Railway Engineering Association in convention assembled lie tendered to the Official Reporters, Messrs. T. E. Crossman and G. W. Burgoyne, for their efficient and accurate report of the Proceedings of this conven- tion, and that a copy of this resolution be spread upon the Minutes and a copy transmitted to them."
(The resolution was unanimously adopted.)
Mr. C. H. Stein (Central Railroad of New Jersey) : — I offer the fol- lowing resolution for adoption :
"Resolved, that the hearty thanks of the members of the American Railway Engineering Association in convention assembled be tendered the Tellers, Messrs. C. H. Spencer, C. H. Fisk and W. J. Bergen, for their arduous labor and for the efficient manner in which the work has been performed."
(The resolution was unanimously adopted.)
Mr. A. F. Robinson (Santa Fe) : — I offer the following resolution:
"Resolved, that the hearty thanks of the members of the American Railway Engineering Association in convention assembled be extended and are hereby tendered the Committee on Arrangements for the efficient manner in which all details for this convention have been carried out.
"Resolved, that the Committee be 'continued at the same salary.' "
(The resolution was unanimously adopted.)
The President : — I will ask the Secretary to announce the election of officers for the ensuing year, and I desire to say that we have imposed on the Tellers this time. They were all afternoon yesterday and long into the evening counting the votes, and we are, therefore, under obliga- tions to the Committee at this time for the care and labor used in the preparation of their report.
The Secretary: — The report of the Tellers is as follows:
REPORT OF TELLERS.
To the Members of the American Railway Engineering Association:
We, the undersigned, appointed Tellers to canvass the votes cast for the election of officers, Board of Direction and Nominating Committee for the year 1912, beg leave to advise that after careful examination and canvass of each ballot the results are as follows :
Total vote cast 517
Unsigned ballots 12
Associate members not counted 20 32
Total vote counted 485
BUSINESS SESSION. 61
President :
C. S. Churchill 483
A. W. Thompson 1
Blank 1
Vice-President :
W. B. Storey, Jr 482
J. B. Berry 1
A. S. Baldwin 1
Robert Trimble 1
Treasurer :
Geo. H. Bremner 485
Secretary:
E. H. Fritch 485
Directors for 3 Years :
F. A. Delano 238
W. L. Darling 236
W. B. Scott 188
C. H. Cartlidge 182
C. C. Anthony 141
S. B. Fisher 131
W. S. Kinnear 117
C. H. Ewing 109
J. M. R. Fairbairn 88
J. G. Sullivan 1
Nominating Committee :
F. L. Stuart 330
C. F W. Felt 307
J. O. Osgood 267
G. J. Ray 249
F. H. Alfred 241
A. K. Shurtleff 224
C. E. Lindsay 216
W. Beahan 203
A. W. Newton 148
C. L. Ransom 125
A. O. Cunningham'. 1
J. F Coleman 1
J. G. Sullivan 1
Respectfully submitted,
C. H. Spencer, C. H. Fisk, W. J. Bergen,
Tellers.
The Secretary — The result of the ballot for officers is as follows :
President — Chas. S. Churchill.
Vice-President — W. B. Storey, Jr.
Treasurer — Geo. H. Bremner.
Secretary— E. H. Fritch.
Three Directors (three years each)— W. L. Darling, F. A. Delano, W. B. Scott.
Five Members of Nominating Committee — 'Francis Lee Stuart, C. F. W. Felt, Jos. O. Osgood, G. J. Ray, F. H. Alfred.
62 BUSINESS SESSION.
The President : — Gentlemen, in relinquishing the office of President, I desire to express my profound appreciation of the honor and favor you have done me in electing me to that office for the past year. I now take pleasure in asking Mr. McDonald and Mr. Wendt to escort the newly-elected President to the platform.
President-Elect Churchill : — Gentlemen, I have always considered a membership on any Committee of this working association to be a posi- tion of distinct trust and prestige, and any official position as an honor. I, therefore, am very grateful for this highest honor that you have con- ferred upon me in making me the President of this Association, which now stands so high in the railway matters of the world.
I thank you. I appreciate the fact that in taking this office after such brilliant stars who have preceded me that I need all the help that the committees and members can give, and I am sure that I will have it, and you shall have my best efforts in everything that we are called upon to carry out.
In my last word I want to call attention to the recommendation of the outgoing President : — that we try to increase the membership for the specific object at this time of increasing the revenues of the Association. There are many matters before this Association that could be looked into further than we are now able to look into them, and experiments which could be carried on which we are now unable to make, because of a lack of sufficient funds. If each member of this Association will leave this assembly with the idea that he will try to bring into the Association during this year more new members, we will in the course of a year or so have the revenue from the membership dues which we require.
This, I believe, is all the business before this convention.
Mr. L. C. Fritch (Chicago Great Western) : — Mr. President. I wish to offer the following resolution :
"Resolved, by the members of the American Railway Engineering Association in convention assembled, that we desire to place on record our hearty appreciation of the well-directed and untiring efforts and eminently efficient administration of the retiring President, Mr. W. C. dishing, and that this resolution be spread upon the Minutes of the meeting and a copy transmitted to Mr. Cushing."
(The question on the adoption of the resolution was put by Mr. J. B. Berry, and was unanimously adopted.)
Past-President Cushing:— I thank you.
The President : — I wish to announce a meeting of the Board of Di- rection in Room 1166, at two o'clock.
The convention is adjourned to March, 1913.
E. H. Fritch, Secretary.
COMMITTEE REPORTS
REPORT OF COMMITTEE XII— ON RULES AND ORGANIZATION.
Jos. O. Osgood, Chairman; G. D. Brooke, Vice-Chairman;
F. D. Anthony. F. P. Gutelius.
J. B. Carothers. Kenneth Hanger.
S. E. Coombs. Jos. Mullen.
J. B. Dickson. F. L. Nicholson.
C. Dougherty. W. C. Smith.
J. A. Gordon. Committee.
To the Members of the American Raihvay Engineering Association:
Your Committee on Rules and Organization respectfully submits here- with its report, as follows :
Meetings of the Committee, Sub-Committees and Chairmen of the Sub-Committees were held as follows : A meeting of the Committee was held in New York, June 9, 191 1; Sub-Committee meetings were held in New York and Chicago on July 21, and in Montreal on July 31, 191 1 ; three Chairmen of Sub-Committees held a meeting in New York on Sep- tember 8, 191 1.
Last year's report of this Committee embodied revisions of the rules as then published in the Manual and additional rules of the same general character, all relating to the government of employes of the Maintenance of Way Department.
For this year's work your Committee was instructed by the Board of Direction to :
(1) Continue the compilation of rules for the government of Main- tenance of Way employes.
(2) Formulate rules in the nature of specifications or instructions regarding the conduct of work, making use of the recommendations of the various Committees dealing with these subjects and of the best practice of railway companies, as embodied in their books of rules.
Some progress has been made with rules falling under the first of the instructions, but this year's report deals only with the work falling under the second of the instructions.
Your Committee recommends :
(1) That no change be made in the General Rules for the Govern- ment of Employes of the Maintenance of Way Department heretofore adopted by the Association.
(2) That to the rules heretofore adopted by the Association be added instructions, as follows :
65
66 RULES AND ORGANIZATION.
♦INSTRUCTIONS. Cross-Sections.
(i) The roadbed, ballast and track shall conform to the standard plans. No changes in the sections shown shall be made without proper authority. ^
(Note: It is understood that cross-sections for wet cuts will be in- cluded in the standard plans.)
Drainage.
(2) All ditches, including intercepting ditches on the upper side of cuts, must be kept clean.
(3) Where heaving or wet spots develop, special drainage shall be provided.
Ballasting.
(4) Before re-ballasting track, line and grade stakes shall be set by the Engineer. All unsuitable material shall be removed and the road- bed widened to proper section, the waste material being used to widen banks, or otherwise, as may be directed.
(5) Track must be kept in good line and surface while ballasting, open track avoided as far as practicable, and such track carefully watched.
(6) After ballast is distributed it shall be trimmed, and the track lined and surfaced to conform to the standard plans.
(7) Where track is bonded, ballast must be kept at least one inch below the base of rail. At road crossings, platforms, etc., where this is not practicable, only clean gravel or rock ballast shall be used.
Ties.
(8) Ties stored along right-of-way shall be piled to conform to the standard plan.
(Note: The standard plan should show the minimum distance to the nearest rail.)
(9) The ties in track must be inspected at stated times each year and those which will not last until the next inspection marked for renewal.
(10) The renewal of ties shall be started when directed by the \ .1.t... When ties are being renewed, the line and sur- face shall be corrected and ballast trimmed.
(11) All defective ties removed from track shall each day be placed for burning or loading on cars.
(12) The *:.}.... shall frequently inspect ties removed
from track to see if any have been removed which might have remained in the track with safety until the next inspection.
(13) Ties shall be spaced according to the standard plans. All ties shall be placed square to the line of rails. The outside ends on double tracks, and the ends on one side throughout on single track, must be lined parallel with the rail.
(14) The heart side of ties must be turned down. The largest and
*For amendments to Clauses 6. 7. 10. 12 and 14, see Index.
RULES AND ORGANIZATION. 67
best ties shall be selected for use at joints. Twisted or badly hewn ties must not be notched, but the bearings must be made true with the adze.
(15) Whenever spikes are drawn from ties, wooden tie plugs must be driven into all holes except in ties which are to be renewed that season. In replacing spikes they should be driven into the plugs.
Rail.
(16) In unloading rails from cars they should be skidded or other- wise carefully lowered to avoid injury. Where it is necessary to drop them, both ends must be dropped together and the greatest care taken to avoid their falling on hard and uneven surfaces.
(17) The bottom of the new rail and the bearing surface of the tie shall be cleaned before the new rail is laid.
(18) When replacing rail with rail of the same section, only two rows of spikes shall be drawn ; in replacing with rail of a different section, three rows of spikes shall be drawn.
(19) In laying new rail, standard expansion shims shall be used. The temperature of the rail shall be taken by placing the thermometer on the rail. The openings between 33 ft. rails shall be as follows:
Temperature (Fahrenheit). Amount of Opening.
— 200 to o° fe in.
0° to 25° Vi, in.
250 to 50° -h in.
50° to 75° V* in-
750 to ioo0 tV in.
Over ioo° to be laid close.
The rail should be laid without bumping and when practicable, laid rail by rail.
(20) The rails shall be brought squarely into line and at least two bolts tightened before spiking. All joint bars shall be securely fastened with the full number of bolts, tightening those at the center first. At permanent connections of rails of different sections step chairs and off-set splices must be used.
(21) All spikes must be driven vertically with the face in contact with the base of the rail. They should not be straightened while being driven. The rail must be full spiked and the spikes staggered so that the outside spikes shall be on the same side of the tie and the inside spikes on the opposite side.
(22) In making temporary connections in main tracks an old rail should be cut and fastened to the new rail, using compromise joints when necessary. Switch points shall be used for this purpose only during the presence of the Track Foreman.
(23) After new rail is laid the track must be lined and surfaced.
(24) All kinked or crooked rails must be straightened before being laid ; if bent in service they must either be removed or straightened.
(25) Rails for curves of 2 degrees and over should be curved before being laid. In curving or straightening rails, the rail bender must be used.
*For amendments to Clauses 17, 18, 20 and 25, see Index.
68 RULES AND ORGANIZATION.
Surfacing.
*(26) When surfacing (picking up low points or other low places), the general level of the track must not be disturbed.
NEXT YEAR'S WORK.
(3) For next year it is recommended that the Committee continue this year's work.
Respectfully submitted,
COMMITTEE ON RULES AND ORGANIZATION.
*For amendment to Clause 26, see Index.
REPORT OF COMMITTEE X— ON SIGNALS AND INTERLOCKING.
A. H. Rudd, Chairman; L. R. Clausen, Vice-Chairman;
Azel Ames. A. S. Ingalls.
C. C. Anthony. J. C. Mock.
H. Baker. F. P. Patenall.
H. S. Balliet. J. A. Peabody.
W. B. Causey. Frank Rhea.
C. A. Christofferson. W. B. Scott.
C. E. Denney. A. G. Shaver.
W. J. Eck. T. S. Stevens.
W. H. Elliott. H. H. Temple.
G. E. Ellis. Edwin F. Wendt.
W. J. Harahan. J. C. Young.
M'. H. Hovey. Committee.
To the Members of the American Railway Engineering Association:
During the past year your Committee has met as follows : At Buffalo, May 25; Buffalo, June 29; Buffalo, July 27.
The Board of Direction assigned four subjects for consideration:
(1) Continue investigation of outline and description of a com- prehensive and uniform signal system, suitable for general adoption, con- ferring with proper committee of the American Railway Association.
(2) Revise mechanical interlocking specifications, and include wrought-iron pipe as well as steel.
(3) Revise electric interlocking specifications and submit statement of the results from experience.
(4) Report on the effect of treated and metal ties on track circuits. Last year your Committee presented revised specifications for various
kinds of insulated wire, which the Association adopted. In order to bring these specifications into conformity with those adopted by the Rail- way Signal Association, a new insulation resistance table is herewith submitted with the following:
CONCLUSION.
(1) The following table of insulation resistances in megohms per mile at sixty (60) degrees Fahrenheit for the various thicknesses of in- sulation in fractions of an inch and the various sizes of wire is made a part of the specifications for mineral matter, rubber compound, insulated signal wire for current of 660 volts or less, appearing in Vol. 12, Part 1,
69
70 SIGNALS AND INTERLOCKING.
pp. 101 to 104, inclusive, and the insulation resistance in megohms per mile, shown on page 108, is revised to conform with this table.
i i L L L i !L *L L _!
B. & S. G. 64 32 64 32 64 32 32 32 32 32
0 900 1100 1200 1300 1500 1800 2000 2200
1 1000 1200 1400 1500 1800 1900 2200 2400
2 1000 1100 1400 1500 1600 1900 2200 2300 2600
3 1100 1200 1500 1600 1800 2000 2300 2600 2700
4 1200 1400 1600 1800 1900 2200 2400 2700 2800
5 1300 1500 1700 1900 2000 2300 2600 2800 3100
6 1400 1600 1800 2000 2200 2600 2800 3100 3400
8 1400 1600 1900 2200 2300 2600 2800 3200 3500 3800
9 1500 1800 2000 2300 2600 2700 3100 3400 3600 3900
10 1600 1900 2200 2400 2700 3000 3200 3600 3900 4200
12 1800 2200 2500 2800 3100 3200 3600 4000 4300 4600
14 2200 2600 2800 3200 3500 3600 4200 4400 4800 5100
(2) The above table of insulation resistances in megohms per mile at sixty (60) degrees Fahrenheit for the various thicknesses of insulation in fractions of an inch and the various sizes of wire is made a part of the specifications for mineral matter, rubber compound, insulated aerial braided cables for current of 660 volts or less, shown on pp. 105 to 109, inclusive, of the same Volume, and the insulation resistance megohms per mile, shown on page 108, is revised to conform thereto.
(3) The above table of insulation resistances in megohms per mile at sixty (60) degrees Fahrenheit for the various thicknesses of insulation in fractions of an inch and the various sizes of wire is made a part of the specifications for mineral matter, rubber compound, insulated, lead-covered, armored submarine cables for 600 or lower voltage service, shown on pp. no to 114, inclusive, of the same Volume, and the insulation resistance megohms per mile, shown on page 113, is revised to conform thereto.
Your Committee does not report this year on subjects Nos. 2, 3 or 4, assigned by the Board of Direction. It reports on Subject No. 1 as follows:
UNIFORM SIGNALING.
This subject was referred to the Committee on Transportation of the American Railway Association by the 1910 convention. In 191 1, progress was reported.
The amended report of the Committee on Transportation, accepted by the American Railway Association, as information, May, 191 1, and transmitted to your Committee X through Secretary Fritch, is as follows :
MEMORANDUM ON THE ESSENTIALS OF SIGNALING.
Incorporated in the Report of the Committee on Transportation of the American Railway Association, May, 1911.
The reports of_ various Committees of the Railway Signal Association and of the American Railway Engineering and Maintenance of Way Association on the subject of signaling have been submitted to this Com- mittee, with the request that the essentials of signaling be outlined or defined for the future guidance of their Committees.
The subject has been carefully analyzed and considered. There are three signals that are essential in operation and therefore fundamental, viz. :
(1) Stop.
(2) Proceed with caution.
(3) Proceed.
SIGNALS AND INTERLOCKING. 71
The fundamental, "Proceed with caution," may be used with the same aspect to govern any cautionary movement, for example, when
(a) Next signal is "stop."
(b) Next signal is "proceed at low speed."
(c) Next signal is "proceed at medium speed."
(d) A train is in the block.
(e) There may be an obstruction ahead.
There are two additional indications which may be used where move- ments are to be made at a restricted speed, viz. :
(4) Proceed at low speed.
(5) Proceed at medium speed.
Where automatic block system rules are in effect, a special mark of some distinctive character should be applied at the stop signal. The Committee therefore recommends :
SIGNAL FUNDAMENTALS.
(1) Stop.
(2) Proceed with caution.
(3) Proceed.
SUPPLEMENTARY INDICATIONS TO BE USED WHERE REQUIRED.
(4) Proceed at low speed.
(5) Proceed at medium speed.
Stop signals operated under automatic block system rules should be designated by some distinctive mark, to be determined by each road in accordance with local requirements.
RECOMMENDATIONS OF COMMITTEE X.
The simplest aspects for the three fundamental indications are : [Z3 1. Stop
2. Proceed with caution.
O
J]
3. Proceed
Having in view, and not desiring to depart from, the established practice of indicating diverging routes and incidentally low and medium speeds, your Committee recommends that the medium and low speed in- dications be given by an additional arm or arms. The simplest method (although incapable of expansion to provide additional aspects or even combinations of the fundamentals and supplementaries) is to use a second arm for both of these indications. The Committee on Transporta- tion rules that the fundamental, "Proceed with caution," may be used to govern any cautionary movement. Therefore, for those roads which de- sire to operate under this plan and deem the five indications entirely sufficient, two additional aspects are necessary:
72
SIGNALS AND INTERLOCKING.
4. Proceed at low speed.
o
p
5. Proceed at medium speed.
D
At interlocking plants which are also block stations it may be desirable, even on such roads, to give passenger trains caution signals for diverging movements, but not for entering occupied block sections ; this would, with the system outlined above, require a separate signal beyond the interlocked switches. It may frequently also be desirable to display the fundamental, "Proceed with caution," on the medium-speed route, and to logically and consistently apply the fundamental aspects for "Proceed with caution" and "proceed" to those signals indicating medium speed and low speed, the 45-degree position should be used for caution and the vertical for proceed.
Again, as the Committee on Transportation merely makes optional the combination of various indications under caution and as several roads have found it desirable to differentiate between such indications, the Committee recommends for such roads a low arm as a low-speed arm and a middle arm where the indication of medium speed is desired.
The Committee on Transportation states that "stop signals operated under automatic block system rules should be designated by some dis- tinctive mark to be determined by each road in accordance with local re- quirements." The instructions to this Committee are to design a uniform system, which end is defeated if each road uses a different method of designating the automatic home signal. Therefore, the Committee recom- mends as follows :
Conclusion No. 1.
On roads desiring to operate with the three fundamentals and the two additional indications without expansion or combination of these in- dications, the following aspects may be used :
Scheme No. 1.
FUNDAMENTALS.
i. Stop.
\0 \0
2. Proceed with caution.
p
3. Proceed .
H U
SIGNALS AND INTERLOCKING.
SUPPLEMENTARY INDICATIONS.
4. Proceed at low speed
73
<?
F
5. Proceed at medium speed.
D
Conclusion No 2.
On those roads desiring combinations of the fundamentals and supple- mentary indications and different aspects for the various caution indica- tions permissible under the ruling of the Committee on Transportation, the following aspects should be used:
Scheme No. 2.
FUNDAMENTALS.
i. Stop.
2. Proceed, prepare to stop at next signal.
3. Proceed.
SUPPLEMENTARY INDICATIONS.
|
=1 |
=1 |
=1 |
|
|
or |
or |
Z] 3 or p |
|
|
f |
f |
f |
|
|
or |
or |
=1 |
|
|
D |
3 |
||
|
n |
a |
J] |
|
|
or |
or |
=1 |
|
|
I] |
■3 |
4. Proceed at low speed, prepare to stop.
O O
F
5. Proceed at medium speed.
D
Conclusion No. 3. When it is desired to indicate "Proceed at medium speed, prepare to stop at next signal," aspect
o
should be used.
74
SIGNALS AND INTERLOCKING.
Conclusion No. 4. When it is desired to indicate, "Proceed at low speed," aspect
iD
should be used.
Conclusion No. 5. When it is desired to indicate, "Proceed, prepare to pass next signal at medium speed," aspect
D
should be used.
Conclusion No. 6. Where in manual block territory, it is de- sired to indicate "Proceed with caution, block occupied," aspect
should be used.
Conclusion No. 7.
That the arms of automatic signals be pointed and the arms of other signals giving the stop indication have square ends ; that, on roads using Scheme No. 1, a number plate be added on the automatic signal and, on roads using Scheme No. 2, a red marker light below and to the left of the active light be provided.
Note. — Messrs. Baker, Clausen, Scott, Stevens and Young do not ap- prove the report on Subject No. 1.
Respectfully submitted, COMMITTEE ON SIGNALS AND INTERLOCKING.
MINORITY REPORT OF COMMITEE X— AMERICAN RAILWAY ENGINEERING ASSOCIATION.
To the Members of the American Railway Engineering Association:
The undersigned believe that the indications provided by the Ameri- can Railway Association are sufficient for the operation of any railroad and are all for which this Association should provide aspects.
We, therefore, recommend that the following indications specified by the Committee on Transportation of the American Railway Association and the aspects used to represent them be accepted and approved as rec- ommended practice :
FUNDAMENTAL
SUPPLEMENTAL
i. Stop.
2. Proceed with caution.
3. Proceed.
O
1. Stop.
2. Proceed with caution ^
D
3. Proceed.
4. Proceed at low speed /y
5. Proceed at medium speed
D
(Stop signals operated under automatic block system rules shall be designated by a number plate.)
The specific objections to the additional indications and aspects pro- vided by the Majority are the same as previously presented to this Asso- ciation and are in accordance with the arguments presented before the Transportation Committee of the American Railway Association at Niagara Falls in June, 1010.
75
76 SIGNALS AND INTERLOCKING.
They are as follows :
i. It is impracticable to provide a separate signal for each of the conditions on a railroad requiring cautious running and to maintain the fine-haired distinctions necessary to their interpretation.
2. It is unnecessary, and, in fact, dangerous, to tell the engineman by fixed signal how he shall control his train at some point in advance.
3. Advance information so given is misleading and unreliable, as it is subject to change without notice, and therefore the engineman cannot safely use it. If he does so use it, it is done at the expense of safety.
4. The conditions of modern railway operation do not require trains to be run at full speed past Caution signals, and any time gained by this practice is at the expense of safety.
5. Each signal should indicate Stop or Caution or Proceed, and have no relation to signals in advance or in the rear.
6. Each signal should be observed in turn as the train comes to it, and not at some point in advance at the option of the engineman.
7. With signals properly located, it is time a train should be run with caution if it has reached a point so close to preceding trains or Stop signals in advance that a Caution signal is received.
8. No Proceed or Caution indication should "imply or assure clear track to a point in advance." Railway signaling devices and our methods of communication have not reached the perfection that will admit of this being done. We cannot know positively if the track is clear, and further, it may not stay clear. We are under a moral obligation not to give such misleading information.
9. The giving of information by signal indications about conditions in advance, whether it be regarding the next signal or the next station, or any other object or condition, is wrong practice, productive of laxity and a fruitful source of danger and accident.
10. It wilj be difficult, if not impossible, to maintain discipline and proper observance of the great variety of Caution indications proposed by the Majority, because of the fine distinctions involved.
A number of serious and fatal accidents in the past few years, wherein the engineman failed to properly observe the Caution signal, but fully intended to stop at the next signal, testify most conclusively to the correctness of our position in this matter.
Respectfully submitted,
H. S. Baker, W. B. Scott, T. S. Stevens, J. C. Young, L. R. Clausen.
REPORT OF COMMITTEE VII— ON WOODEN BRIDGES AND TRESTLES.
C. C. Wentworth, Chairman; W. F. Steffens, V ice -Chairman ;
F. H. Bainbridge. Hans Ibsen.
F. E. Bissell. Henry S. Jacoby.
W. S. Bouton. J. A. Lahmer.
R. D. Coombs. H. Rettinghouse.
E. A. Hadley. I. L. Simmons.
Committee.
To the Members of the American Railway Engineering Association:
COMMITTEE MEETINGS.
One meeting of the Committee was held in Chicago at the offices of the Association on October 2, 191 1. Those in attendance were H. Ibsen, H. Rettinghouse, I. L. Simmons and C. C. Wentworth.
REVIEW OF THE REPORT OF 19H.
A pile record form was recommended and adopted. See Proceedings, Vol. 12, Part 1, page 307; also Manual, Edition of 191 1, page 154.
Principles of practice for pile driving were recommended, and, after some amendment by the convention, adopted. See Proceedings, Vol. 12, Part 1, pp. 307 to 320, inclusive; also Manual, Edition of 191 1, pp. 150 to 152, inclusive.
The remainder of the report on piles and pile driving was accepted as information, so also was the conclusion as to a means of protecting piling against marine borers by surrounding each pile with a vitrified clay pipe and filling the space between the pile and the pipe with sand. See Pro- ceedings, Vol. 12, Part 1, page 322.
The work assigned by the Board of Direction for the year 191 1 was as follows :
(1) Report on the formulas for use in determining the strength of sheet piling.
(2) Report on equipment required for pile driving.
(3) Collect information on special methods of driving sheet piles in cofferdams where conditions do not permit the use of ordinary equip- ment.
(4) Collect information on actual experience on the bearing power of piles and on the practical results of the use of formulas.
(5) Report on the use of guard rails for wooden bridges and trestles.
(6) Report on fire protection of wooden bridges and trestles.
77
78 WOODEN BRIDGES AND TRESTLES.
In accordance with the general rules as to Committee reports given on page 14 of Bulletin 134, the following subjects were finally selected for consideration this year : Nos. 1, 4, 5 and 6 of the foregoing list. The Committee reports its progress thereon as follows :
(1) Sheet Piling — .Prof. H. S. Jacoby, Chairman; and H. Ibsen, Sub- Committee :
This subject Committee VII did not think could be reported on this year, as an experimental investigation, which it was hoped Cornell Uni- versity would make, could not be completed in time for report if under- taken; and it was thought that the result of these experiments would be of much service in making up its final report to the Association. The Committee has since been advised that Cornell could not undertake these experiments, but the Committee hopes that some other Institution may find it desirable that they be carried out by it.
The procedure suggested for these experiments was that a strong concrete open top box be made, across which at its middle a vertical plate diaphragm of tempered spring steel could be set; this diaphragm being held in place against horizontal motion at its top and bottom. On both sides of this diaphragm the box would be simultaneously filled with the material to be tested, as sand ; thus, when the box is full, represent- ing sheet piling driven in sand.
The sand was then to be removed from one side of the diaphragm, as would occur when a trench is excavated protected by sheet piling. After the diaphragm had assumed the curve due to the pressure of the sand its curved shape was to be accurately determined and a closely fitting tem- plate made to record its curvature.
In order to determine the amount and distribution of the sand pres- sure, the diaphragm would then be removed from the box and placed horizontally, supported at its ends at the same points it was supported by when vertical in the box. A number of metal strips should be provided, each long enough to reach across the diaphragm, but of vary- ing thickness to make up any required weight, and of equal width. These would be piled at equal intervals on the diaphragm until the curve of flex- ure is again exactly reached by it which was given it by the sand and recorded by the template; bearing in mind that the tops of the succes- sive piles of metal strips must be on a curve of some uniformity, which may be called the curve of load, without such irregular outline as that of a battlement, and carried over the supports on the line indicated by the curve approaching them. The total pressure, and the center of pres- sure, would thus be determined, it is thought, with considerable accur- acy.
As a check, the flexure curve of the diaphragm already found could be plotted to a convenient scale, and successive differentials taken thereof up to and including the fourth. As the equation of this flexure curve is unknown, the differentiation would be done graphically, remembering that the first differentiation gives the curve of tangents to the flexure curve ; the second the curve of moments ; the third the curve of shear,
WOODEN BRIDGES AND TRESTLES. 79
and the fourth the curve of load, which should agree with the curve of load determined by the first method — that of weights superimposed on the horizontal plate.
Other materials than sand need testing, such as a heavy semi-fluid mud, and ballast. In each case the angle of repose would be noted of the unretained material, and its weight per cubic foot.
In order to obtain definite conclusions the concrete box and steel diaphragm should be of rather large size; and to prevent the friction of the retained material on the sides of the box from affecting the result ma- terially, narrower steel plates could be placed on each side of the main diaphragm, observations being taken on the main plate only.
The investigation could be extended to determine the pressure on abutments, which are generally filled against gradually on one side only, though this is not part of the work of this Committee. It seems prob- able that under such mode of filling, the total pressure would be greater, and its center lower, than in the case of sheet piling.
(4) Pile Formulas — F. E. Bissell, Chairman; F. H. Bainbridge, R.
D. Coombs and W. F. Steffens, Sub-Committee :
A large number of requests for information were sent out, but the chief matter to be noted from the replies received was the very small number of roads keeping record of their pile driving in form for use in this investigation.
It seems to the Committee that while a pile driving formula should be based on theoretical considerations, there are so many modifying con- ditions to be allowed for that the result is a formula more or less em- pirical in its final make-up.
These modifying conditions can best be noted from actual experience in pile driving ; and members are urged, for the advancement of the art. to keep record of the behavior of piles during driving and after loading. Especially is this record valuable in the case of test piles loaded to failure.
(5) Guard Rails — H. Ibsen, Chairman: Prof. H. S. Jacoby, I. L. Simmons and H. Rettinghouse, Sub-Committee :
A large amount of work was done on this subject, replies having been received from members and others representing a mileage of 119,314. These replies were tabulated and considered, but recommendations were not reached for presentation to the Association.
It seems that there are two types of guard rail in use ; a guard rail being a member as defined on page 130 of the Manual, Edition of 191 1. In one type the two rails are brought together at their ends at the middle of the track ; in the other, two similar rails are not brought together at their ends, but remain parallel to the stock rail, and a third rail, also straight, is put in the middle of the track ; all three rails in the latter case being deflected at their ends below base of rail.
(6) Fire Protection — I. L. Simmons, Chairman ; F. H. Bainbridge, F.
E. Bissell, H. Isben and J. A. Lahmer, Sub-Committee:
Replies to a circular letter of inquiry were received from members and others representing 110,214 miles of railway. Of this mileage 62 per
80 WOODEN BRIDGES AND TRESTLES.
cent, when using fire protection adopted either full ballast decks, floors protected by a thin covering of ballast or other like material, or by sheet metal.
NEXT YEAR'S WORK.
The Committee recommends that the same subjects be assigned it for the year 1912 as were assigned for the year 191 1, and given in full at the beginning of this report.
Respectfully submitted, COMMITTEE ON WOODEN BRIDGES AND TRESTLES.
REPORT OF COMMITTEE XV— ON IRON AND STEEL STRUCTURES.
C. H. CartlidgE; Chairman; A. J. Himes, y ice-Chair man;
J. A. Bohland. Albert Reich mann.
Charles Chandler. A. F. Robinson.
C. L. Crandall. C. C. Schneider.
J. E. Crawford. O. E. Selby.
J. E. Greiner. C. E. Smith.
J. M. Johnson. I. F. Stern.
C. N. MONSARRAT. F. E. TURNEAURE.
W. H. Moore. Committee.
To the Members of the American Railway Engineering Association:
Your Committee held two meetings during the year 191 1 — one at Niagara Falls on June 27 and the other at Chicago on October 24th.
We have to report as follows :
Subject No. 1 — Investigation on Impact and Secondary Stresses : Appendix B contains a report from Prof. F. E. Turneaure, Chairman of Sub-Committee on Impact, giving an outline of the work done by the Committee during the past year.
Subject No. 2 — Influence of Theory, Experiment and Experience on Bridge Design : It was unanimously decided by the Committee that it was unable to report adequately on this subject, and the request is therefore made that the subject be dropped.
Subject No. 3 — Rules for Instruction and Guidance of Inspectors in Mills, Shop and Field: The Committee reports progress. The Chairman of the Sub-Committee has received discussion from two of the members of his Sub-Committee, and will probably be able to submit a paper giving the results of their findings during the next few months.
Subject No. 4 — Design of Built-up Columns : The tender of the serv- ices of this Committee to collaborate with the Joint Committee of the American Society of Civil Engineers was made and very promptly ac- cepted. Sufficient time has not yet elapsed to permit the organization of any actual work on this subject. The program proposed by the A. S. C. E. Committee is very elaborate and comprehensive and when carried out will immensely increase our knowledge of the subject. In order that this Committee do any practical work on this subject, it will be necessary to have funds. Your Committee understands, of course, that none of the funds of the Association are available for this purpose. We feel warranted, however, in recommending that individual roads be asked to contribute for the purpose of making these tests. This work
81
82 IRON AND STEEL STRUCTURES.
and that of the Impact Committee are original research work and it is hardly necessary for us to point out the ultimate value of the work done in the manner in which it has been done. It will probably be necessary in the near future to take cognizance of these experiments in our speci- fications for design, but the Committee does not recommend that any change be made at present, nor until further experiments on secondary stresses have been made, and if possible, considerable work on columns. The Committee will present later a more definite report of the probable amount of money needed for the first year's work. It is expected that this will be very small and that it can easily be raised.
Subject No. 5 — (Specifications for Erection of Steel Bridges: In Appendix A the Committee presents for the consideration of the Asso- ciation a set of specifications, revised in accordance with the discussion at the last convention and with the written discussions from members and others received since the convention.
CONCLUSIONS.
The recommendations of the Committee are as follows : (i) That the specifications for Bridge Erection be adopted and printed in the Manual.
(2) That the report of the Impact Committee be received as in- formation.
(3) That no change be made at present in the specifications printed in the Manual.
Respectfully submitted,
COMMITTEE ON IRON AND STEEL STRUCTURES.
Appendix A.
SPECIFICATIONS FOR THE ERECTION OF RAILROAD BRIDGES. Work to Be Done.
i. The Contractor shall erect, rivet and adjust all metal work in place complete, and perform all other work hereinafter specified.
Plant.
2. The Contractor shall provide all tools, machinery and appliances necessary for the expeditious handling of the work, including drift pins and fitting up bolts.
Falsework.
3. The method of erection and plans for falsework and erection equipment shall be subject to approval by the Engineer, but such approval shall not relieve the Contractor from any responsibility. False- work will be built by * Falsework material of
every character will be provided by the *
The temporary structure for use during erection and for maintaining the traffic shall be properly designed and substantially constructed for the loads which will come upon it. All bents shall be thoroughly secured against movement, both transversely and longitudinally. The bents shall be well secured against settling, and piles used wherever firm bottom cannot be obtained. Upon completion of the erection, the temporary structure, if the property of the Railway Company, shall be removed without unnecessary damage, and neatly piled near the site or loaded on cars, as may be directed. If the property of the Contractor, it shall be re- moved in a manner subject to the approval of the Engineer.
Falsework placed by the Railway Company under an old structure or for carrying traffic, may be used as far as practicable by the Contractor during erection, but it shall not be unnecessarily cut or wasted.
Conduct of Work.
4. The work shall be prosecuted with sufficient force, plant and equip- ment to expedite its completion to the utmost extent and in such a man- ner as to be at all times subordinate to the use of the tracks by the Railway Company, and so as not to interfere with the work of other contractors or to close or obstruct any thoroughfare by land or water, except under proper authority.
Reasonable reduction of speed will be allowed upon request of the Contractor.
*Insert "Railway Company" or "Contractor," as the case may be.
83
84 IRON AND STEEL STRUCTURES.
Tracks shall not be cut nor shall trains be subjected to any stoppage except when specifically authorized by the Engineer.
The Contractor shall protect traffic and his work by flagman furnished by and at the expense of the Railway Company. The Contractor shall provide competent watchmen to guard the work and material against injury.
Engine Service.
5. If under the contract, work train or engine service is furnished the Contractor free of charge, such service shall consist only in unloading materials and in transferring the same from a convenient siding to the bridge site. Other engine service shall be paid for by the Contractor at
the rate of $ per day per engine, the time to include the
time necessary for the engine to come from and return to its terminal. When engine service is desired the Contractor shall give the proper railway officials at least 24 hours' advance notice and the Railway Company will furnish the service as promptly as possible, consistent with railroad operations.
When derrick cars are used on main tracks, their movements shall be in charge of a train crew, and the expense of the crew and any engine service other than as noted above shall be charged to the Contractor.
Transportation.
6. When transportation of equipment, materials and men is fur- nished free over the Railway Company's line, it shall be subject to such conditions as may be stated in the contract.
Masonry.
7. The Railway Company will furnish all masonry to correct lines and elevations, and unless otherwise stated in the contract, will make all changes in old masonry without unnecessarily impeding the operations of the Contractor. The Railway Company's engineers will establish lines and elevations and assume responsibility therefor, but the Contractor shall compare the elevations, distances, etc., shown on plans, with the masonry as actually constructed as far as practicable, before he assembles the steel. In case of discrepancy, he shall immediately notify the Engineer.
Handling and Storing Materials.
8. Cars containing materials or plant shall be promptly unloaded upon delivery therefor, and in case of failure to do so the Contractor shall be liable for demurrage charges. Material shall be placed on skids above the ground, laid so as not to hold water, and stored and handled in such a manner as not to be injured or to interfere with railroad operations. The expense of repairing or replacing material damaged by rough handling shall be charged to the Contractor. The Contractor, while unloading and storing material, shall compare each piece with the shipping list and promptly report any shortage or injury discovered.
IRON AND STEEL STRUCTURES. 85
Maintenance of Traffic.
9. When traffic is to be maintained it will be carried on in such a manner as to interfere as little as practicable with the work of the Contractor.
Changes in the supporting structure or tracks required during erection shall be at all times under the direct control and supervision of the Rail- way Company. Removal of Old Structure.
10. Unless otherwise specified, metal work in the old structure shall be dismantled without unnecessary damage and loaded on cars or neatly piled at a site immediately adjacent to the tracks, and at a convenient grade for future handling, as may be directed. When the structure is to be used elsewhere all parts will be matchmarked by the Railway Com- pany; when the old bridge is composed of several spans the parts of each shall be kept separate.
Metal Work.
11. Material shall be handled without damage. Threads of all pins shall be protected by pilot and driving nuts while being driven in place.
Light drifting will be permitted in order to draw the parts together, but drifting for the purpose of matching unfair holes will not be per- mitted. Unfair holes shall be reamed or drilled.
Nuts on pins and on bolts remaining in the structure shall be effectively locked by checking the threads.
All splices and field connections shall be securely bolted prior to riveting. When the parts are required to carry traffic, important connec- tions, such as attachments of stringers and floor beams, shall have at least fifty (50) per cent, of the holes filled with bolts and twenty-five (25) per cent, with drift pins. All tension splices shall be riveted up complete before blocking is removed. When not carrying traffic, at least thirty-three and one-third (33}<3) per cent, of the holes shall have bolts.
Rivets in splices of compression members shall not be driven until the members shall have been subjected to full dead load stresses. Rivets shall be driven tight. No recupping or calking will be permitted. The heads shall be full and uniform in size and free from fins, concentric and in full contact with the metal. Heads shall be painted immediately after acceptance.
Rivets shall be uniformly and thoroughly heated and no burnt rivetj shall be driven. All defective rivets shall be promptly cut out and re- driven. In removing rivets the surrounding metal shall not be injured ; if necessary, the rivets shall be drilled out. Misfits.
12. Correction of minor misfits and a reasonable amount of reaming shall be considered as a legitimate part of the erection.
Any error in shop work which prevents the proper assembling and fitting up of parts by the moderate use of drift pins, and a moderate amount
86 IRON AND STEEL STRUCTURES.
of reaming and slight chipping or cutting, shall be immediately reported to the Engineer and the work of correction done in the presence of the Engineer, who shall check the time expended.
The Contractor shall render an itemized bill for such work of correc- tion for the approval of the Engineer.
Anchor Bolts.
13. Holes for all anchor bolts, except where bolts are built up with the masonry, shall be drilled by the Contractor after the metal is in place and the bolts shall be set in Portland cement grout.
Bed Plates.
14. Bed plates resting on masonry shall be set level and have a full even bearing over their entire surface ; this shall be attained by either the use of Portland cement grout or mortar, or by tightly ramming in rust cement under the bed plates after blocking them accurately in position. Decks.
15. The * will frame and place the per- manent timber deck.
Painting.
16. The paint will be furnished by * and
shall be of such color, quality and manufacture as may be specified.
Surfaces inaccessible after erection, such as bottoms of base plates, tops of stringers, etc., shall receive two coats of paint before assembling in place. After erection, the entire structure shall receive two coats of paint, allowing enough time between coats for the first coat to dry before applying the second. No paint shall be applied in wet or freezing weather, nor when the surface of the metal is damp. Painting shall be done in good and workmanlike manner, subject to strict inspection during progress and after completion, and in accordance with special instructions which shall be given by the Engineer. All metal shall be thoroughly cieaned of dirt, rust, loose scale, etc., before the paint is applied. Clearing the Site.
17. The Contractor, after completion of the work of erection, shall remove all old material and debris resulting from his operations and place the premises in a neat condition.
Superintendence and Workmen.
18. During the entire progress of the work the Contractor shall have a competent superintendent in personal charge and shall employ only skilled and competent workmen. Instructions given by the Engineer to the superintendent shall be carried out the same as if given to the Con- tractor. If any of the Contractor's employes by unseemly or boisterous conduct, or by incompetency or dishonesty, show unfitness for employment on the work, they shall, upon instructions from the Engineer, be discharged
♦Insert "Railway Company" or "Contractor," as the case may be.
IRON AND STEEL STRUCTURES. 87
from the work, nor thereafter be employed upon it without the Engineer's consent.
Inspection.
19. The work of erection shall at all times be subject to the inspec- tion and acceptance of the Engineer.
Responsibility.
20. The Contractor shall assume all responsibility for loss or damage to his own work, materials or plant, due to any cause; also, for all loss or damage to the Railway Company's materials or property, and to other property adjacent to the railroad, due to causes within his reasonable control.
The Contractor shall assume all responsibility for injury to the work- men and the public, or to any individual ; and in case of accident or suit he shall defend the suit in person and relieve the Railway Company from all costs and expenses, and pay any judgments that may be recovered thereon.
The Contractor shall comply with the laws and ordinances affecting the manner of doing work; shall take out all necessary permits and com- ply with their requirements, and shall take such precaution as may be necessary to protect life and property.
Insurance and Bond.
21. The Contractor shall carry such liability insurance as is necessary to protect himself and the Railway Company against loss or damage caused by injuries to his men, and shall furnish the Railway Company a bond in form and of a surety acceptable to the Railway Company, providing for the faithful performance of the work and all matters pertaining thereto, in such sum as shall be specified in the contract.
Engineer.
22. The term "Engineer," as used herein, shall be understood to mean the Chief Engineer of the Railway Company, or his accredited repre- sentative.
Clauses 20 and 21 to be eliminated; Clause 22 to be renumbered. See Index.
Appendix B. SECONDARY STRESSES.
We herewith submit a brief report of progress relative to tests of secondary stresses, which were carried out during the past summer by your Sub-Committee on Impact and Secondary Stresses.
Through the assistance of the mechanician's shop at the University of Wisconsin, we were able to develop and manufacture a special form of extensometer for use in measuring secondary stresses. An important requirement of such an instrument is freedom from friction of all moving parts and, in general, a high degree of sensitiveness, combined with sta- bility and strength of framework, convenience of adjustment and ma- nipulation. An instrument was developed along the line of the ex- tensometers used for impact tests, but to secure sensitiveness the principal bearings were made of knife edges, and instead of using a pencil for se- curing a continuous record, a ray of light is allowed to pass through a minute perforation in a disc at the end of the long lever, and a path of this ray of light is photographed on a moving slip of sensitized paper.
The apparatus proved satisfactory in practical operation, and the method of obtaining the record was found to be very good indeed. The sensitized paper was developed in the field so that results could quickly he obtained.
Four of these extensometers were made by the University of Wiscon- sin and were used by the Committee on its tests.
About three weeks were spent in the field and tests were made on the following bridges :
On the Chicago, Milwaukee & St. Paul Railway, a 160-ft. riveted span and a 176-ft. pin-connected span at Byron, 111., a 104-ft. pony truss span at Rockton, 111., in which eye-bars were used for the diagonal mem- bers, and a span of the same length at Brodhead, Wis., in whicfh all members were riveted.
On the Chicago & North- Western Railway, a 182-ft. riveted truss, a 75-ft. deck-plate girder, and a through riveted lattice truss, all on the new Belt Line at Milwaukee.
At the present time preliminary results only are available, which are not in form for publication. It is expected that before the meeting in March it will be possible to present all important results, together with comparative results determined from a theoretical analysis.
In all of these tests the Railroad Company furnished a special train, and such other facilities in the way of mechanics as were needed ; and your Sub-Committee desires here to express its great appreciation for the assistance thereby rendered.
The field work was carried out by Professors C. L. Crandall and F. E. Turneaure, members of the Sub-Committee, assisted by Messrs. W. L. Conwell and W. A. Axtell, of Cornell University, and Messrs. W. S. Kinne, 0. L. Kowalke and J. B. Kommers, of the University of Wisconsin.
Respectfully submitted,
C. L. CRANDALL, F. E. TURNEAURE, Sub-Committee on Impact. 88
REPORT OF COMMITTEE XIV— ON YARDS AND TERMINALS.
C. H. Spencer, Chairman; E. B. Temple, V ice-Chairman; Hadley Baldwin. L. J. McIntyre.
W. C. Barrett. B. H. Mann.
M. S. Blaiklock. A. Montzheimer.
G. H. Burgess. W. L. Seddon.
A. E. Clift. A. Swartz.
A. L. Davis. J. E. Taussig.
H. T. Douglas, Jr. E. E. R. Tratman.
A. C. Everham. W. L. Webb.
D. B. Johnston. J. G. Wishart.
H. A. Lane. Committee.
To the Members of the American Railway Engineering Association:
Your Committee on Yards and Terminals submits herewith its Twelfth Annual Report.
The Board of Direction has assigned the following subjects to your Committee :
(i) Report on typical situation plans of passenger stations, of both through and stub types, with critical analyses of working capacity, and include a review of the different methods of estimating their capacity.
(2) Report on developments in the handling of freight by mechanical means.
(3) Report on developments in the design and operation of hump yards.
(4) Report on typical' situation plans for a division engine terminal.
(5) Report on methods of handling baggage, express and mail, at passenger terminals.
The Committee was also instructed to consider revision of Manual ; if no changes were recommended, to make statement accordingly, and to make concise recommendations for next year's work.
The Committee held two meetings during the year, in addition to the meetings of the various Sub-Committees, as follows :
St. Louis, Mo., June 26 and 27; Washington, D. C, October 6 and 7.
A large amount of work has been done by all of the Sub-Committees on topics assigned to them.
REVISION OF MANUAL.
After careful consideration of the present Manual, the Committee has no recommendation for further changes at the present time.
89
90 YARDS AND TERMINALS.
(i) TYPICAL SITUATION PLANS OF PASSENGER STATIONS.
The Sub-Committee has accumulated a large amount of data with respect to existing terminals. The subject assigned, however, is so broad and important that it is desirable to continue work on it through another year. In view, therefore, of the expressed desire of the Board of Direc- tion that the reports be limited as far as possible, it was decided to reserve report on this subject until next year.
(2) HANDLING OF FREIGHT BY MECHANICAL MEANS.
Considerable progress has been made at different points in the de- velopment of freight handling by mechanical means since the Committee's last report, and during the past year inspection was made of the new Missouri, Kansas & Texas Railway freight handling plant at Broadway Station, St. Louis, Mo., the Baltimore & Ohio Railroad telpher system at Pier No. 8, Locust Point, Baltimore, Md., the power conveyor system in one of the new warehouses of the Texas City Transportation Com- pany, at Galveston, Texas, and of the electric truck system at Dock No. 6, Jersey City, N. J. As nearly all of these systems are practically new and sufficient time has not elapsed since installation to enable all points as to their utility to be definitely determined, both as to economy of operation and practical utility, full report on these systems is held over for future publication.
The attention of the Association is called to certain published articles noted below in relation to this subject:
1. Freight House at St. Louis, with Mechanical Freight-Handling Equipment ; Engineering News, June 29 ; Railway Age Gazette, June 23 ; Railway and Engineering Review, November 11.
2. Electric Truck System at Dock No. 6, Jersey City, N. J.; Rail- way and Engineering Review, July 29.
3. Mechanical Handling of Freight (by S. B. Fowler) ; Proceedings of the American Society of Mechanical Engineers; Railway and Engi- neering Review, February 11.
4. Motor Trucks for Freight Transportation ; Engineering News, June 22.
5. Freight Handling Installations at River Ports ; Engineering News, May 4.
6. Mechanical Handling of Package Freight; Engineering News, May 11.
7. A Freight Station for the Use of Storage Battery Trucks ; En- gineering Record, January 28.
8. Electric Trucks for Handling Freight and Baggage ; Engineer- ing News, May 11, June 22, December 7.
9. Telfer System for Handling Baggage at an English Passenger Terminal Station; Engineering News, August 17.
10. Terminals, Yards and Mechanical Handling of Baggpge at Sta- tions; Bulletin of the International Railway Congress, November, 191 1.
YARDS AND TERMINALS. 91
ii. Cargo Transference at Steamship Terminals (H. McL. Hard- ing) ; Proceedings of the Society of Naval Architects and Marine Engi- neers, 191 1.
12. Terminals and Freight Piers at Boston; Engineering News, November 2, 191 1.
13. Freight Piers and Freight Handling Machinery at Boston, Engi- neering News, November 9, 1911.
(3) DESIGN AND OPERATION OF HUMP YARDS.
Additional data on existing hump yards has been secured by Sub- Committee, and is held for future report.
(4) TYPICAL SITUATION PLANS FOR DIVISION ENGINE
TERMINAL.
In treating this subject, the Committee understands its work to be the making of recommendations as to the best arrangement of facilities for the handling of locomotives at terminals rather than as to specifica- tions for exact designs of the various structures involved, excepting as in a general way the characteristics of such structures seem to be more or less suited to the arrangement recommended.
It is also understood that the scope of the Committee's work does not include the consideration of shop or repair yard locations.
We submit herewith a typical plan or layout for an engine terminal whose characteristics permit of application equally well to larger or smaller demands practically without limit and without respect to whether the locomotives cared for are all freight or passenger, or in both kinds of service.
We have examined a number of plans of recently constructed engine terminals, and think we have adopted in our plan the best ideas of all, and that we have avoided the manifest errors of some at least of these plans. It must, of course, be recognized that in any case of actual construction, physical limitations as to space and shape of the ground site will impose more or less modification of the plan we recommend, but we think it will come more generally within the possibility of any given set of conditions than any other typical plan that could be suggested.
In locating an engine terminal, the facilities should be placed with reference to the yards and main line in the most advantageous position possible, that is, so that the distance between the engine terminal and the points where engines begin and end their service shall be a minimum, and so that reverse or conflicting movements shall be avoided as much as practicable.
The idea to be kept in mind is the most direct and convenient, that is, rapid and economical performance of those things required for an engine in its terminal in that sequence which answers all requirements in the order of their urgency. It appears to us that on the arrival of a locomotive at its terminal, the first imperative demand is likely to be
92 YARDS AND TERMINALS.
for water, and that this demand is likely to be the last when leaving the terminal for service, and for this reason our typical plan provides for the location of watering facilities accordingly.
After an incoming engine has been protected by receiving water, the next step appears logically to clean its fires or remove it entirety, according to need, and place the engine as quickly as possible in the engine house where the repairs necessary to prepare it for new service may be made, engine cleaned, etc. The cinder pit should be located as close as practicable to the engine house and permit at the same time of en- gines moving off cinder pit in normal direction, being switched direct to an outbound track without using or fouling turntable, as may often be desired.
It appears logical that the process of coaling should be reserved, if practicable, until just before the engine re-enters service in order that it may do so with a maximum supply of fuel, and also because the cleaning or removal of fire on cinder pit, as well as repairs of engine tank or other repairs, can be accomplished without that interference that might result from having tender filled with coal, and this reasoning dictates that the location of the coaling station should be primarily to serve the outbound tracks. Inasmuch, however, as it may often occur that incoming engines will require coal, the coaling station should be located as indicated on our typical plan, so that coal may also be taken by an engine on an inbound track.
The trestle type of coal dock may be used if desired, if only two coaling tracks are required, and can be located between the inbound and outbound tracks in same relative position as shown in typical plan.
The most convenient and economical arrangement for storing and drying sand is at the coal station, where it may be handled by the same attendants. Sand should ordinarily be delivered to engines passing on the inbound tracks.
It will be observed that the arrangement of facilities permits of large increase in capacity of cinder pit, coaling station, etc.,- and in this connection the idea of having the coaling station at a busy terminal comprising two independent units makes a strong appeal for approval in view of the possibility of one of the hoisting plants suffering tem- porary disability from breakdown, or other cause.
The location of storehouse, oil house, enginemen's tool and locker rooms need not be arbitrarily prescribed, but should be as close as prac- ticable to the engine house and the cinder pit. However, where any of these buildings are served by their own tracks, those tracks should be so located and connected as not to interfere with the uninterrupted free use of the engine tracks.
A system of ample lighting facilities is important, with lights dis- tributed so as to avoid, as far as practicable, darkness or shadow where men are engaged in work upon engines.
TYPICAL PLAN OF RNGINE TERMINAL.
93
sy
se
le er
TrfitC *L &L **/V QT fA/GtMC 7f
Ptoooosco mv Sum Co***** Tree A/o£
YARDS AND TERMINALS. 93
CONCLUSIONS.
(i) The engine terminal should be so located as to afford easy access to both Main Line and Yards, with the fewest possible reverse or conflicting movements.
(2) The facilities provided should be arranged to permit of the most direct and rapid handling of an engine in its terminal in the order of its needs.
The Committee recommends for next year's work a continuation of Subjects Nos. 1, 2 and 3, enumerated above.
Respectfully submitted, COMMITTEE ON YARDS AND TERMINALS.
REPORT OF COMMITTEE II -ON BALLAST.
H. E. Hale, Chairman; W. J. Bergen. A. F. Blaess. T. C. Burpee.
F. T. Darrow. J. M. Egan.
T. W. Fatherson. H. L. Gordon.
G. H. Harris.
J. M. Meade, Vice-Chair man;
C. C. Hill.
S. A. Jordan.
A. S. More.
J. V. Neubert.
S. B. Rice.
E. V. Smith.
F. J. Stimson. S. N. Williams.
Committee.
To the Members of the American Raihvay Engineering Association:
Two meetings of the Committee were held in Chicago, one on July 27, and one on November 13, 191 1.
Five meetings of Sub-Committees were held during the year, as fol- lows: June 26, at Washington, D. C. ; June 30, at St. Louis; July 27, at Chicago ; October 7, at Chicago ; November 1, at Washington, D. C.
REPORT ON THE PROPER DEPTH OF BALLAST TO INSURE
UNIFORM DISTRIBUTION OF THE LOADS ON
THE ROADBED.
REVIEW OF PREVIOUS REPORT.
The report of the Committee on the proper depth of ballast submitted during the year 1910 was in the form of a progress report, accompanied by a table showing the approved depth of ballast on various railroads, as printed in the Proceedings, Vol. 12, Part 1, page 345, but on account of lack of sufficient information on which to base definite recommenda- tions, no action was taken on this subject by the Association.
DEFINITIONS.
Depth of Ballast. — The distance from the bottom of the tie to the top of the subgrade. (For definition of "subgrade," see Manual, 191 1, page 16.)
historical.
Various experiments and investigations have been made to deter- mine the proper depth of ballast, and a list of some of the most im- portant ones follows :
(A) Experiments by Railroad Director Schubert, in Germany, given
95
96 BALLAST.
in Proceedings, American Railway Engineering and Maintenance of Way Association, Vol. 7 (1906), page 102.
(B) Report on the "Question of Strengthening the Track and Bridges, with a View to Increasing the Speed of Trains," made to the International Railway Congress by the Reporter for America, Mr. M. L. Byers, and later published in the Engineering News, of February 3, 191a
(C) An article entitled "Gravel as Ballast," by Mr. C. Brauning, translated from "Zeitschrift fur Bauwesen," Vol. LIV, Berlin, 1904, being Appendix "C" (Bulletin 136, pp. 157-179).
(D) An article on "Ballast," by Mr. George W. Vaughan, Engineer Maintenance of Way, New York Central & Hudson River Railroad, printed in this report at Appendix "D" (Bulletin 136, pp. 180-190).
(E) Report of Pennsylvania Railroad General Manager's Committee appointed "To Determine by Experiment the Necessary Depth of Stone Ballast," dated March 5, 191 1, being Appendix "B" (Bulletin 136, pp.
3-155)-
(F) "A Study of the Stresses Existing in Track Superstructure and Rational Design Based Thereon," by Mr. O. E. Selby, Bridge Engineer, Cleveland, Cincinnati, Chicago & St. Louis Railway, published in Pro- ceedings, American Railway Engineering and Maintenance of Way Asso- ciation, Vol. 8, 1907, pp. 52-59.
ANALYTICAL.
Your Committee feels that very valuable information was given to the Association in the report of the Pennsylvania Railroad Committee on the necessary depth of stone ballast, published in Bulletin 136, through the kindness of Mr. W. C. Cushing, President of the American Railway Engineering Association, and Mr. L. R. Zollinger, Chairman of the Com- mittee, appointed by the General Manager of the Pennsylvania Railroad.
The details of the test, which are very complete, are given in Ap- pendix "D" of this report, and the conclusions, in so far as the proper depth of ballast which will insure uniform pressure on the subgrade, are as follows :
The tests made by the Pennsylvania Railroad at Altoona indicate that with approximately 320,000 to 440,000-lb. axle loads, or 75,000 lbs. each, pass- ing over test ties on the test ballast, at five miles per hour, the subgrade practically reached a permanent settlement, and that where the ballast was materially less than 24 in., the settlement of the subgrade (loam) und«? the ballast was not uniform, but showed a greater settlement under tbk. ties than between the ties.
These experiments further indicated that when stone ballast was placed 24 in. deep under the ties, the settlement of the subgrade (loam) under the ballast was practically uniform, and therefore the pressure must have been approximately uniform.
It was also found that a combination of stone and cinder ballast 24 in. deep under the ties (lower layer of cinders 18 in. to 14 in. deep, upper layer of stone 6 in. to 10 in. deep) gave nearly as gooil results, although
BALLAST. 97
the deformation of the subgrade was greater than with 24 in. of stone ballast.
The result of this series of tests, which indicated that approximately 24 in. of stone ballast is required to produce a uniform pressure on the subgrade, with the ties spaced 24 in. to 25.5 in., center to center, agrees very closely with the formula given by Mr. Thos. H. Johnson, in the Proceedings of the American Railway Engineering and Maintenance of Way Association, Vol. 7 (1006), which was derived from the experiments of Director Schubert, namely, that with ties spaced 23 in. apart, center to center, stone ballast should be 22 2-3 in. deep to produce uniform pressure on the subgrade.
CONCLUSION.
With the data available, your Committee finds that with the ties (7 in. by 9 in. by SZA ft.) spaced approximately 24 in. to 25.5 in., center to center, a depth of 24 in. of stone ballast is necessary to produce uni- form pressure on the subgrade, and a combination of a lower layer of cinder ballast (18 in. to 14 in.) and an upper layer of stone ballast (6 in. to 10 in.), approximately 24 in. deep in the aggregate, with the same spacing of the ties will produce nearly the same results.
REPORT ON PHYSICAL TESTS OF STONE FOR BALLAST.
REVIEW OF PREVIOUS REPORTS.
The Physical Tests of Stone for Ballast adopted by the Association and described in Vol. 11 (1910), Part 2, pp. 910-914, were the first tests of this character adopted by the Association, and the question of re- vising the tests, if necessary, or adding other tests to those adopted, was again referred to the Ballast Committee for furher investigation and consideration.
HISTORICAL.
Your Committee ascertained that the railroads as a rule had no uni- form practice in making physical tests of stone for ballast. Some of the roads selected their stone for ballast by simply observing the character of the stone, and then ascertaining its durability and fitness for ballast by the actual results obtained in track. Some roads required a compression test in their specifications, but only one railroad was found to have used the physical tests made by the United States Government, previous to their adoption by the Association, as above referred to.
ANALYTICAL.
Your Committee does not recommend any changes in the physical tests already adopted, but feels that the tests would be more complete if the compression test were added.
With this in view, the question was taken up with the Department of Agriculture of the United States Government at Washington, D. C,
*For amendment to Conclusion, see Index.
98 BALLAST.
and they have agreed to add the compression test to those adopted by the Association, which were described in Vol. n (1910), Part 2, pp. 910-914. of the Association Proceedings.
The description of the compression test, which the Government will make, is as follows :
A cylinder two (2) in. in diameter and more than two (2) in. long is drilled from the specimen of stone to be tested, by means of a diamond core drill, and sawed to a length of two (2) in. by a band saw fed with emery. The specimen is finally faced off on each end by means of a power-driven grinding lap, on which water and emery are continuously fed.
The cylinder then has both ends embedded in plaster of paris, the bed being made as thin as possible and both ends being made parallel. The cylinder is next mounted on an Olsen test machine on a special bear- ing block between blotting papers, three thicknesses being placed at each end, between the cylinder and the steel-bearing faces of the machine. The load is then applied at a speed of 0.152 in. per minute, the machine being kept balanced during the application of the load.
Your Committee believes that with the physical tests of stone for Ballast, which the Association adopted, and the compression test above described, sufficient information will be given by which to compare the character of stone from the various quarries from which it is proposed to obtain ballast.
As a matter of information your Committee has, during the past year, requested a number of railroads to send samples of their stone ballast to the Government for test, and through the assistance and courtesy of these railroads we are enabled to present a tabulated statement of the re- sults of these tests, and while this statement is not as complete as was desired, yet we feel it will be of considerable value in studying this question.
ADVANTAGES AND DISADVANTAGES.
The advantage of using approved physical tests of stone for ballast is to determine the character of the stone and its fitness for ballast without the expense of opening quarries and using the stone, before it is known whether it will be suitable for ballast or not, and without some method of determining this by physical tests, railroads will undoubtedly be put to considerable expense by opening quarries and applying stone ballast, which in some cases will have to be replaced with better ballast from other quarries.
CONCLUSIONS.
Your Committee recommends that in addition to the Physical Tests of Stone for Ballast, which have been adopted by the Association, that the "Compression Test," above described, be adopted and included in the Manual.
Your Committee also recommends that the following reference be made in the Manual to the description of the tests and the action nec- essary to have tests made:
BALLAST. 99
"For the description of the physical tests of stone for ballast as recommended by the Association and full instructions as to how the sam- ples should be obtained and shipped to the Government, see Proceedings of the American Railway Engineering and Maintenance of Way Associa- tion, Vol. ii, Part 2, pp. 910-914, and report of Ballast Committee of 1912. If blueprints of the machines used in making the tests are desired, they can be obtained from the Department of Agriculture, United States Govern- ment, Washington, D. C."
COMPLETE REVIEW OF GRAVEL BALLAST AND RECOM- MENDED METHODS FOR GRADING THE DIFFERENT QUALITIES.
REVIEW OF PREVIOUS REPORT.
In the Proceedings of the American Railway Engineering and Main- tenance of Way Association, of 1910, Vol. 11, pp. 909-932, a classifi- cation of gravel ballast was adopted by the Association, which depended on the amount of sand and dust found in the gravel, the size of the sand, and the size of the gravel, being determined in accordance with the defini- tions of "Sand and Gravel" given in the Manual, and this subject was again referred to the Ballast Committee for a complete review.
ANALYTICAL.
Your Committee, during the year, requested a number of railroads to test their gravel ballast and determine the percentage of sand, gravel (following the definitions of sand and gravel, given in the Manual), dust etc., in the ballast, and we present herewith a statement showing the percentages as found in ballast now in use, and a brief of the reports obtained from the railroads in regard to the use of these deposits of gravel for ballast is as follows :
The Santa Fe Railway reports that it is using the Chillicothe gravel almost entirely and finds it to be very satisfactory, giving good results on the roadbed, as it comes from the pit, using 12 in. under the ties.
The Chicago, Burlington & Quincy Railroad reports show gravel being taken from four different places, and put under the tracks as it is loaded from the pits, which makes excellent track, binds well and is easily worked.
The Chicago, Rock Island & Pacific Railway reports gravel taken from five different places, the best being from Benton, Ark., on their Southern lines, but not equal to the glacial gravel of Iowa and Illinois. The gravel was used on the track as it came from the pits, and not washed.
Twelve tests of pits on the Grand Rapids & Indiana Railroad are shown in the tabulated statement. The ballast is not washed, but is put in the track as it comes from the pit.
In the case of the Illinois Central Railroad, the tabulated statement shows tests from four different places, and the ballast from each is used
100
STATEMENT
BALLAST.
SHOWING PERCENTAGES OF SAND, CLAY, ETC., IN GRAVEL BALLAST
|
Name of |
Location of Gravel Pit |
PERCENTAGES |
|||||
|
Railway |
Dust and Clay |
Sand |
Grav- el |
Rock Voids |
Remarks |
||
|
C. B. &Q |
Atchison, Kansas.. . . |
10.0 |
12.7 |
77.3 |
0.0 No Data |
Per cent, by weight. Main track. |
|
|
C. B. &Q |
O'Neill, Neb |
8.5 |
57.5 |
34.0 |
0.0 No Data |
Per cent, by weight . Branch line. |
|
|
C. B. &Q |
Ballantine, Montana. |
7.0 |
4.9 |
52.5 |
35.6 ! No Data |
Per cent, by weight. Main line. |
|
|
C.B.&Q |
Peetz, Colorado |
4.8 |
51.5 |
42.5 |
1.2 1 No Data |
Per cent, by weight. Main line. |
|
|
C. R. I. & P |
Chillicothe, Illinois.. |
6.0 |
60.0 |
40.0 |
0.0 No Data |
Per centege arrived at by volume. |
|
|
C. R. I. & P |
Grattinger, Iowa .... |
16.4 |
41.4 |
53.7 |
No No Data Data |
Percentage arrived at by volume. |
|
|
C. R. I. & P |
Benton, Arkansas |
23.3 |
20.8 |
79.2 |
No No Data Data |
||
|
C. R. I. & P |
On St. Louis Division |
5.8 |
22.0 |
80.0 |
No No Data Data |
||
|
C. R.I.&P |
16.3 |
11.8 |
90.9 |
No No Data Data |
|||
|
G. R.&I |
Big Rapids, Michigan |
6.0 |
32.0 |
78.0 |
No No Data Data |
Shown as good qual- ity of ballast. |
|
|
G.R.&I |
Sand Lake, Michigan |
18.0 |
44.0 |
63.0 |
No Data |
No Date |
Shown as fair quality of ballast. |
|
G. R.&I |
5.0 |
30.0 |
80.0 |
No Data |
No Data |
Shown as poor qual- ity of ballast. |
|
|
G. R.&I |
Belmont Pit |
0.5 |
15.0 |
91.0 |
No Data |
No Date |
|
|
ity of ballast. |
|||||||
|
G.R.&I |
M..G R.&I |
0.0 |
40.0 |
75.0 |
No Data |
No Data |
Shown as fair quality of ballast. |
|
G. R. & I |
Paris Pit |
15.0 |
40.0 |
70.0 |
No Date |
No Data |
|
|
ity of ballast. |
|||||||
|
G. R. &I |
11.0 |
36.0 |
72.0 |
No Data |
No Data |
||
|
ity of ballast. |
|||||||
|
G. R. &I |
5.0 |
40.0 |
72.0 |
No Data |
No Data |
||
|
ity of ballast. |
|||||||
|
G. R. & I |
Tustin |
8.0 |
42.0 |
72.0 |
No Data |
No Data |
|
|
ity of ballast. |
|||||||
|
G.R.&I |
K. S. Tower Pit, Oden |
13.0 |
60.0 |
48.0 |
No Data |
No Data |
Shown as poor qual- |
|
G.R.&I |
K. S. Tower Pit, T. C. Sect. 2 |
18.0 |
49.0 |
55.0 |
No Data |
No Data |
Shown as poor qual- ity of ballast. |
|
G.R.&I |
K. S. Tower Pit, T.C. Sect. 3 |
15.0 |
56.0 |
50.0 |
No Data |
No Data |
Shown as poor qual- ity of ballast. |
|
G. R.&I |
K. S. Tower Pit, T.C. Sect. 4 |
16.0 |
55.0 |
50.0 |
No Data |
No Data |
Shown as poor qual- ity of ballast. |
BALLAST.
101
STATEMENT SHOWING PERCENTAGES OF SAND, CLAY, ETC., IN GRAVEL
BALLAST.
|
Location of Gravel Pit |
PERCENTAGES |
||||||
|
Name of Railway |
Dust and Clay |
Sand |
Grav- el |
Rock |
Voids |
Remarks |
|
|
G.R.&I |
Suttons Bay Pit |
15.0 |
36.0 |
67.0 |
No Data |
No Data |
Shown as poor qual- ity of ballast. |
|
I. C |
Forreston, Illinois |
4.8 |
17.2 |
72.0 |
6.0 |
20.0 |
|
|
I. C |
Riverton, Indiana. . . |
7.9 |
23.5 |
68.6 |
0.0 |
13.4 |
|
|
I. C |
Gravel Switch, |
7.0 |
6.2 |
85.0 |
1.8 |
18.8 |
|
|
I. C |
Memphis, Tennessee. |
3.3 |
17.8 |
77.7 |
1.2 |
17.3 |
|
|
Fowler, Colorado |
2.0 |
65.0 |
33.0 |
0.0 |
No Data |
Fair results. |
|
|
Ft. Gibson, |
5.0 |
4.0 |
94.0 |
0.006 |
No Data |
Clay included in per- |
|
|
Bethel, Arkansas. . . . |
4.0 |
34.0 |
76.0 |
0.0 |
No Data |
||
|
N. Y. C.&H. R. |
18.0 |
55.0 |
27.0 |
No Data |
No Data |
Sample No. 16. |
|
|
N. Y. C. & H. R. |
5.0 |
20.0 |
75.0 |
No Data |
No Data |
Sample No. 17, first |
|
|
quality. |
|||||||
|
N. Y. C. & H. R. |
Glenfield |
18.0 |
57.0 |
25.0 |
No Data |
No Data |
Sample No. 19, coarse |
|
sand, very good but dusty. |
|||||||
|
N. Y. C. & H. R. |
Todds |
10.0 |
35.0 |
55.0 |
No Data |
No Data |
Sample No. 18. |
|
N. Y. C. & H. R. |
8.0 |
27.0 |
65.0 |
No Data |
No Data |
Sample No. 21. |
|
Note. — The sand and gravel in the ballast given in the above table was determined in accordance with the definition of sand and gravel in the Manual, edition of 1911.
102 BALLAST.
in the track as it comes from the pits, except in the case of the Memphis gravel, which is taken from the bed of the Mississippi River and washed.
The Missouri Pacific Railway reports tests from three different places, and like the other roads the ballast was used on the track as it came from the pits.
It will be seen from the reports of the six different roads that no expense was incurred in washing or screening the gravel, which was used upon the tracks as it came from the pits, except in the case of the Illinois Central Railroad, for gravel secured at Memphis.
A report from the Chief Engineer of the Intercolonial Railroad of Canada states that he is of the impression that if they screened their gravel they would not get as good results as where they took the sand with a coarser material combined.
A report from the Engineering Department of the Canadian Pacific Railway states that they are ballasting with gravel taken direct from the pit, without any cost of treatment.
Your Committee further endeavored to determine the maximum amount of clay which would be permissible in good cementing ballast, and by reference to the data we have on this subject we find that most of the tests that have been made of gravel ballast give very meager in- formation as to the amount of clay in cementing ballast, but from the best information we have at hand we are of the opinion that where the clay amounts to over 10 per cent, it would be quite objectionable.
Your Committee wishes to give a high endorsement of the report on "Gravel as Ballast," by Mr. C. Brauning, which Mr. W. M. Dawley had translated from "Zeitschrift fiir Bauwesen," Vol. LIV, Berlin, 1904. We also present to the Association, under Appendix "A," a description and photographs of a gravel washing plant on the Richmond, Fredericks- burg & Potomac Railroad, at Massaponax, midway between Richmond, Va., and Washington, D. C, which plant is under the charge of Mr. S. B. Rice, Engineer Maintenance of Way, to whom we are indebted for that report. The results obtained from this washed gravel ballast, as can be seen from this report, are far superior to the results obtained from the use of gravel for ballast without washing.
CONCLUSIONS.
Your Committee recommends further investigation of the amount of sand, dust and clay, permissible in good gravel ballast, since reports ob- tained this year from various railways, and attached hereto in a tabulated statement, indicate wide variations in the amount of these materials found in gravel ballast in actual use, yet reported as giving good results.
Respectfully submitted,
COMMITTEE ON BALLAST.
Appendix A.
GRAVEL WASHING PLANT OF THE RICHMOND, FREDERICKS- BURG & POTOMAC AND WASHINGTON SOUTHERN RAILWAYS.
By. S. B. Rice, Engineer Maintenance of Way.
The latter part of July, 1907, or about the time the double tracking of the Richmond, Fredericksburg & Potomac Railroad and Washington Southern Railway had been completed, the officials were discussing the matter of using stone ballast to make the line first-class in every respect, it being a through trunk line between Richmond, Va., and Washington, D. C, with a traffic that is very heavy. We have an average of 24 through passenger and 10 local trains daily during the heavy season and an average of 20 through passenger and 10 local trains daily during the light season, the through trains consisting of from six to twelve cars and the local trains of from four to five cars. We have an average of 20 freight trains daily throughout the year. Weight of heaviest engine, 156,730 lbs. on drivers; total weight, 373,200 lbs.
About this time we had discovered a heavy deposit of very excellent gravel at Massaponax, Va., 57 miles from Richmond, midway between that point and Washington, and thought it possible that we could make a first-class road from this material. The gravel lies in a bed from ten to twenty feet in depth, about 800 ft. wide and 4,000 ft. in length. The pit we estimated to contain about 1,000,000 cu. yds. of serviceable mate- rial. The pit was opened on August 22, 1007.
The pit-run gravel from this pit was used on portions of our track and made an excellent track, but in long, dry seasons it was found to be very dusty, and in long wet spells we found that track became sloppy. In the latter part of 1907 we conceived the idea of washing and screening this material, as was done by the Lake Shore & Michigan Southern Railway at Roupel and Pleasant Lake. In July, 1908, W. D. Duke, Assistant to President; S. B. Rice, Engineer Maintenance of Way, and E. M'. Hastings, Resident Engineer, made a trip to the Roupel plant with a view of looking into the advisability of duplicating this plant, also to have the opportunity of inspecting track that had been ballasted with washed gravel. Mr. Duke was so much pleased with the condition of the track and plant that he at once recommended the installation of the washing plant at Massaponax at the earliest possible time. The authority for this work was given in the latter part of July, 1908. Work was at once started on this plant and pushed as rapidly as possible to have it completed before bad weather set in. The first shipment of washed gravel was on November 20, 1908, start- ing at the Richmond end.
103
104 BALLAST.
The plant consists of a large concrete hopper into which the pit-run gravel is dumped, from which it is carried by a pan conveyor having a speed of 30 ft. per minute, or 120 to 150 cu. yds. per hour, on an incline of 30 degrees, to the top of the trestle some 45 ft. high, where it is discharged into a steel-lined box, 6x3 ft. in plan and one foot deep in front, or at the chute. The water, discharged from a flat nozzle, one inch wide and 24 in. long, connected to a 6-in. discharge pipe, strikes the gravel as it falls into the box, washing it down over a steel-lined chute, six ft. wide and eight ft. long, with a slope of 3 in. to the foot.
It was found necessary, in order to more completely wash the gravel, to place a series of rods across the chute, making the gravel tumble over them, thereby retarding its progress and obtaining a more complete washing.
At the end of the chute there is a double screen placed at an angle of about 45 degrees with the chute. The screens are about 9 in. apart, and are of double-crimped tool steel wire. The first of No. 6 wire, one mesh to the inch ; the second of No. 10 wire, two meshes to the inch. All gravel that does not pass these two screens falls into the ballast bin, which is 36 ft. long and 12 ft. wide and about 12 ft. deep. The lower six ft. of this bin is sloped toward the center, so that the gravel will fall by gravity through the openings in the bottom. (Fig. 4.)
All of the material which passes these two screens along with the water falls upon a second steel-lined chute which is eight ft. wide, nine ft. long, and a slope of two in. to the foot. From this chute the material is discharged against another screen, of double crimped tool steel wire No. 12, four meshes to the inch. This screen takes out practically every- thing larger than y$-in. in diameter. All material which does not pass this screen falls into the ballast bin also.
The material passing the screen is carried over another steel-lined chute about ten ft. wide and seven ft. long, where it is discharged as sand into a settling tank about 12x13 ft. and three ft. deep. On the side of the tank opposite this chute is the waste flume where the muddy water is car- ried off and discharged on the bed of gravel where the gravel had been previously excavated.
The settling tank is water-tight and is fitted at the bottom with two conical steel hoppers, six ft. in diameter at the top and ten in. in diameter at the base, five ft. deep. The bottoms of the steel cones are fitted with a steel cone plug which makes them nearly water-tight. The plugs or cones are operated from the top. The idea of having two of the conical hoppers was to grade the sand, the coarse sand settling in the first hopper and the fine sand in the farther one, there being a distinct difference in the two grades of sand. For this sand we have found ready sale, as it is of ex- cellent quality for building purposes and concrete work, the finer sand making excellent engine sand.
The ballast bin is steel-lined throughout and has three openings at the bottom, fitted with 20x20 in. rack and pinion valves, spaced so as to empty into the center and two ends of the ballast car, giving a uniform
BALLAST. 105
loading without necessitating the moving of car. The material is dis- tributed in the ballast bin about equally over the three openings.
The water is brought from Massaponax Creek through a gravity canal, 900 ft. long (Fig. 1), to a concrete lined well, 7x5 ft. and 11 ft. deep; the bottom of the well being four ft. lower than the creek at the intake. This canal is a 20x20-in. open wood flume for 500 ft. where it runs into a 20x20-in. wood box, covered by some eight ft. of earth. This box is about 370 ft. long, where connection is made with an 18-in. terra cotta pipe, which runs under the engine foundation and pull-out track into the well, which is located close to the engine ; this flume is always submerged. The pump is an Emerson pump No. 4 with a 6-in. suction, rated for a 5-in. discharge. The rated capacity is from 800 to 1,200 gallons per minute. To overcome friction it was fitted with a 6-in. discharge. The steam is furnished by a go H.P. return tubular boiler, which is under same roof as engine and pump. We also have a No. 5 pulling pump, rated at 350 gal- lons per minute, for the purpose of pumping water into a 25,000 gallon tank about 1,400 ft. distant, which is used by ballast and spotting engines. This tank is located on the pull-out track, just north of the coal bin.
At this point we have the office and bunk houses for both white ana colored help. These bunk houses are separated. The Superintendent of the plant is on the ground at all times. Steam shovel and spotting engine crews are provided with both lodging and board.
The concrete hopper (Fig. 4), into which the pit gravel is dumped preparatory to washing, is 18 ft. above the foundation, 36 ft. long and 12 ft. wide inside, the outside walls are two ft. thick. The inside of the hopper slopes from the top all ways toward the center opening, which is 18x20 in., and provided with a steel sliding door which governs the feed on the conveyor. The slant sides of the hopper are six in. thick, rein- forced with from l/2 to i^-in. iron rods, spaced 18 in. in centers and bent over into the two ft. outside walls. They are fastened together with y2-'m. rods spaced about 12 in. apart. The track on the hopper is carried on 12x14 in. wood stringers, one of which is immediately over the outside wall, the other carried on I2xi4-in. cross stringers, spaced six ft. c. to c, and imbedded in the outside walls. The track over the hopper is fitted with a bar screen, bars spaced 4^ in. apart, so as to prevent roots, stumps, boulders, or large lumps of clay from being carried to the washing plant.
The approach to the hopper (Fig. 1) is on a 2 per cent, grade as- cending, which terminates at a point 150 ft. from the end of the hopper, thence by a 1 per cent, descending grade, which continues over the hopper, where it breaks into a 2.5 per cent, descending, then to a 5 per cent, descending grade for about 150 ft., then to an 18 per cent, ascending grade. At the junction of the 5 per cent, and 18 per cent, grades there is located a spring switch, the track leading away from the switch being on a descend- ing grade to the pit level, the idea being to do most of the shifting by gravity. The loaded cars after being pushed up the 2 per cent, approach to the hopper are unloaded, dropped from the 5 per cent, grade by gravity, and up on the 18 per cent, grade, which gives them a kick back through
106 BALLAST.
the spring switch and down to the pit level, where they are taken by the engine to be reloaded.
It is intended to cover the 112 miles of double track with washed gravel, thereby securing a dustless roadbed. In order to accomplish this we had new grades given, making a lift in track from 3 to 16 in., taking out some slight sags that were in tracks. Of course, where the track was lifted as much as 6 inches the old ballast could be worked under the ties, but at the other points the old sand and gravel ballast was thrown out to make roadbed. Ballast was loaded into the Rodgers drop bottom ballast cars and delivered in track, using a Rodgers plow for levelling down. This work was carried on by an extra force, renewing all ties that were not good for two years, regaging track and properly spacing ties ahead of new ballast. The renewal of ties and regaging was charged to maintenance ; surfacing track was charged to reballasting. It required from 3,200 to 3,800 cu. yds. to the double track mile. The force em- ployed at the pit consists of the following : One general foreman, one clerk, one shovel engineer, one craneman, one shovel fireman, four men at shovel, one engineer in charge of plant, one towerman who operates the machinery at top of plant, also looking after the screens, one foreman on hopper, one hopper and two helpers, one sand loader, one gravel loader and two droppers of cars. In addition to this there are three men on cars closing them up and calking and getting them ready for sand. Shift- ing track is generally done by section force and is, of course, charged to pit expense.
Since the starting of the washing plant there have been 371,877 cu. yds. of washed gravel shipped, of which 354,439 cubic yards were used for ballast and 17,438 cu. yds. for concrete and other purposes. From this total amount of gravel we have taken 78,232 cu. yds. of sand, most of which has been sold for building purposes. Of course, the hauling of this has been revenue to the Company. Cost per cubic yard of loading rough gravel, 8.95 cents; cost per cubic yard of washing gravel, 11.34 cents; cost per cubic yard for hauling, il.ll cents; cost per cubic yard for placing in track, 26.15 cents; or a total cost of 57.55 cents per cubic yard of fin- ished track. This cost includes hire of all engines, train crews, coal and supplies ; rental of shovel, coal, supplies and repairs ; one cent per cubic yard to cover cost of gravel in pit and 10 per cent, depreciation on plant and tracks ; but no credit is taken in these figures for sand sold.
We have found by actual test that the washed gravel is nearly self- draining; it will not retain over nTA per cent, of water, while the pit-run gravel will retain 55 per cent. It has been demonstrated that the washed gravel will withstand any amount of continued rain and not slop, while the pit-run would, causing rough track in continued wet spells. Aside from the better condition of track we estimate to add at least two years to life of the ties. It makes a dustless roadbed and reduces the cost of main- tenance.
BALLAST.
107
O
>
fe
1LS
5ALLAST.
BALLAST
109
K
pq
O
>
[x,
110
BALLAST.
Fig. 4— View Showing Where Gravel is Emptied from Carrier and
Where Water First Strikes It, Also Showing Action the
Ballast and Water Take in Passing Over the Bars
into the First Flume.
RESULTS OF GOVERNMENT TESTS ON STONE FOR BALLAST, RESULTS IN TRACK, AND RAILWAY BALLAST SPECIFICATIONS.
• IN TIUOK IND riAII.WAI rill II II Ml..'.!,
.>»...«.
'.l (lOVl IINM1 N i llhnuai ir,..„i„^
> * lifr.i.1 8ta» Co, Pataoa C». lad.
inhhtlV ID . Co-3w.:: Co, K>
:=: Co Otto ■»Go.O»*> v< W«t Co, Oa, WlnjiiniKi Co,OMa WatVo. Uor»aCo,Pa .
* -a- Ma at Blraan. Barb Co. Pa '..
PlaBaT JaAraa Co. T «. . Bcraw Plana, UMmmm Co . T«a . ■m Float, Jafaaaa Co, T«
|
oa en |
|
|
US |
|
|
ia |
1 M |
|
1M |
oa |
|
IB |
|
|
IS |
|